← Back to Patent Explorer
US3695335A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for making composite materials from refractory fibers and metal

Assignee: Individual
•
Filing: 1970-09-08
•
Granted: 1972-10-03
•
Expires: 1990-09-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for the manufacture of a composite material comprises providing in a mould an admixture of reinforcing refractory fibers and a molten metal, applying to the admixture an encapsulating pressure program until a desired densification is achieved and at least during initial application of the encapsulating pressure program arranging adjacent each path of potential leakage from the mould a heat sink having a heat capacity sufficient to solidify molten metal contacting the heat sink and thereby seal the said leakage path.

Inventors

  • 👤 John Corjeag Cannell
  • 👤 Rodney Seymour Leaper
  • 👤 Noel James Parratt

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 12:52
CPC Classifications
B; B22; B22D; B22D19/00; B22D19/02; B22F; B22F3/00; B22F3/24; B22F3/26; Y; Y10; Y10S; Y10S264/00; Y10S264/19

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 23 words
A process according to claim 1 wherein the encapsulating pressure program is applied by a piston acting upon the admixture in the mould.
Claim 2
Dependent Claim 45 words
A process according to claim 2 wherein the piston is maintained at about 100* C below the solidus temperature of the molten metal during the initial application of the encapsulating pressure program to solidify molten metal tending to escape through leakage paths around the piston.
Claim 3
Dependent Claim 37 words
A process according to claim 2 wherein excessive cooling of the admixture prior to completion of the encapsulating pressure program is prevented by introducing a thermally insulating material between the admixture and the piston applying encapsulating pressure.
Claim 4
Dependent Claim 30 words
A process according to claim 4 and in which excessive cooling is additionally prevented by the presence of a particulate mould release agent between the mould sides and the admixture.
Claim 5
Dependent Claim 21 words
A process according to claim 4 wherein the mould and piston are unheated before the admixture is provided in the mould.
Claim 6
Dependent Claim 27 words
A process according to claim 4 wherein the mould is heated to between about 200* C and 400* C before the admixture is provided in the mould.
Claim 7
Dependent Claim 29 words
A process according to claim 1 wherein the admixture of reinforcing refractory fibers and metal are introduced into the mould as a preheated admixture of molten metal and fibers.
Claim 8
Dependent Claim 28 words
A process according to claim 8 wherein the preheated admixture is introduced into the mould contained within an envelope of metal which is solid at the pre-heating temperature.
Claim 9
Dependent Claim 43 words
A process according to claim 1 wherein the admixture of reinforcing refractory fibers and molten metal are provided in the mould by first introducing a mass of reinforcing fibers into the mould and then covering the mass with a charge of molten metal.
Claim 10
Dependent Claim 25 words
A process according to claim 10 wherein the molten metal is superheated above its melting point in order to delay the solidification of the admixture.
Claim 11
Dependent Claim 24 words
A process according to claim 10 wherein the mass of reinforcing fibers in the mould is preheated prior to the introduction of molten metal.
Claim 12
Dependent Claim 184 words
A process for the manufacture of a composite material which comprises providing in a mould an admixture of particulate reinforcing material and a molten metal, applying to the admixture an encapsulating pressure program until a desired densification is achieved, said encapsulating pressure program comprising: a first stage of infiltration pressure sufficient to force molten metal around the particulate reinforcement material to form an interconnecting network of molten metal; a second stage of increased pressure to consolidate the composite by removing microscopic voids remaining in the composite by forcing molten metal into them and causing residual trapped gases to dissolve in the metal; a third stage of pressure sufficient to ensure that as the molten matrix metal solidifies and contracts voids which tend to open as a result of metal contraction within the composite are closed by deformation of the metal matrix; and at least during initial application of the encapsulating pressure program arranging adjacent each path of potential leakage from the mould a heat sink having a heat capacity sufficient to solidify molten metal contacting the heat sink and thereby seal the leakage path.
Claim 13
Dependent Claim 26 words
A process according to claim 1 wherein the first stage infiltration pressure lies between the minimum value calculated from surface tension theory and twice that value.
Claim 14
Dependent Claim 18 words
A process according to claim 14 wherein the infiltration pressure is between about 500 psi and 1,000 psi.
Claim 15
Dependent Claim 20 words
A process according to claim 1 wherein the second stage consolidation program is between about 2,000 psi and 40,000 psi.
Claim 16
Dependent Claim 16 words
A process according to claim 1 wherein the third stage pressure is at least 2,000 psi.
Claim 17
Dependent Claim 20 words
A process according to claim 1 wherein the molten metal matrix is non-wetting in contact with the reinforcing fiber surface.
Claim 18
Dependent Claim 15 words
A process according to claim 1 wherein the molten metal matrix is an aluminum alloy.
Claim 19
Dependent Claim 27 words
A process according to claim 1 wherein the refractory reinforcing fiber is selected from the group consisting of silicon carbide and silicon nitride whiskers and carbon fibers.

References Cited (Backward Citations)

US1950356A Cited
US1956907A Cited
US3270383A Cited
US3364975A Cited
US3472308A Cited
US3529655A Cited
US3547180A Cited
US3571901A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-10-03 1976-04-03 1976-10-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-10-03 1980-04-03 1980-10-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-10-03 1984-04-03 1984-10-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag