← Back to Patent Explorer
US3685589A Expired / Lapsed US ⏱️ 0.0 years remaining

Ballast treating machine

Assignee: Franz Plasser Bahnbaumaschinen Industrie GmbH
•
Filing: 1970-12-10
•
Granted: 1972-08-22
•
Expires: 1990-12-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a ballast treating apparatus, wherein ballast is removed from underneath a track section, cleaned on a screen which separates the removed ballast into clean ballast and rubble, and the clean ballast is returned to the ballast bed, two overlapping conveyor bands are arranged to receive the rubble from the screen and move it away in opposite directions.

Inventors

  • 👤 Franz Plasser
  • 👤 Josef Theurer
  • 👤 Karl Folser

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 19:52
CPC Classifications
E; E01; E01B; E01B27/00; E01B27/06; E01B27/10; E01B27/105; E01B2203/00; E01B2203/01; E01B2203/015; E01B2203/02; E01B2203/022; E01B2203/04; E01B2203/045; E01B2203/06; E01B2203/065; E01B2203/10; E01B2203/12; E01B2203/127

Claims Analysis

Total Claims: 23
Claim 1
Independent Claim 168 words
An apparatus for treating ballast and adapted to move in a working direction on a track including rails fixed to ties resting on a ballast bed, comprising 1. a frame moving on the track rails; 2. a ballast removing chain means mounted on the frame and including a stringer extending horizontally and transversely underneath the track for removing ballast from the ballast bed; 3. a ballast cleaning screen mounted on the frame and separating the removed ballast into clean ballast and rubble; 4. a conveyor system for conveying removed ballast from the ballast removing chain means, and for conveying the clean ballast from the ballast cleaning screen to the ballast bed in a conveying path; and 5. further conveying means arranged to receive the rubble from the screen and for removing the rubble, the further conveying means including a first conveyor band arranged to move the rubble forwardly in the working direction and a second conveyor band arranged to move the rubble backwardly in respect of said direction.
Claim 2
Independent Claim 168 words
An apparatus for treating ballast and adapted to move in a working direction on a track including rails fixed to ties resting on a ballast bed, comprising 1. a frame moving on the track rails; 2. a ballast removing chain means mounted on the frame and including a stringer extending horizontally and transversely underneath the track for removing ballast from the ballast bed; 3. a ballast cleaning screen mounted on the frame and separating the removed ballast into clean ballast and rubble; 4. a conveyor system for conveying removed ballast from the ballast removing chain means, and for conveying the clean ballast from the ballast cleaning screen to the ballast bed in a conveying path; and 5. further conveying means arranged to receive the rubble from the screen and for removing the rubble, the further conveying means including a first conveyor band arranged to move the rubble forwardly in the working direction and a second conveyor band arranged to move the rubble backwardly in respect of said direction.
Claim 3
Dependent Claim 27 words
a ballast removing chain means mounted on the frame and including a stringer extending horizontally and transversely underneath the track for removing ballast from the ballast bed;
Claim 4
Dependent Claim 27 words
a ballast removing chain means mounted on the frame and including a stringer extending horizontally and transversely underneath the track for removing ballast from the ballast bed;
Claim 5
Dependent Claim 18 words
The apparatus of claim 1, wherein at least one of the conveyor bands is movable in both directions.
Claim 6
Dependent Claim 31 words
The apparatus of claim 1, wherein each of said conveyor bands has an end extending under the ballast cleaning screen, the conveyor band ends overlapping in the direction of track elongation.
Claim 7
Dependent Claim 18 words
a ballast cleaning screen mounted on the frame and separating the removed ballast into clean ballast and rubble;
Claim 8
Dependent Claim 18 words
a ballast cleaning screen mounted on the frame and separating the removed ballast into clean ballast and rubble;
Claim 9
Dependent Claim 33 words
a conveyor system for conveying removed ballast from the ballast removing chain means, and for conveying the clean ballast from the ballast cleaning screen to the ballast bed in a conveying path; and
Claim 10
Dependent Claim 33 words
a conveyor system for conveying removed ballast from the ballast removing chain means, and for conveying the clean ballast from the ballast cleaning screen to the ballast bed in a conveying path; and
Claim 11
Dependent Claim 68 words
The apparatus of claim 3, wherein one of the overlapping conveyor band ends is arranged above the other conveyor band end, a conveyor band of the conveyor system for conveying the clean ballast to the ballast bed is arranged adjacent the one conveyor band end, and ballast guide means is arranged to direct ballast from the one conveyor band end to the conveyor band of the conveyor system.
Claim 12
Dependent Claim 29 words
The apparatus of claim 1, further comprising ballast guide means mounted between the screen and the first and second conveyor bands for distributing the rubble onto said conveyor bands.
Claim 13
Dependent Claim 51 words
further conveying means arranged to receive the rubble from the screen and for removing the rubble, the further conveying means including a first conveyor band arranged to move the rubble forwardly in the working direction and a second conveyor band arranged to move the rubble backwardly in respect of said direction.
Claim 14
Dependent Claim 51 words
further conveying means arranged to receive the rubble from the screen and for removing the rubble, the further conveying means including a first conveyor band arranged to move the rubble forwardly in the working direction and a second conveyor band arranged to move the rubble backwardly in respect of said direction.
Claim 15
Dependent Claim 24 words
The apparatus of claim 1, further comprising a ballast storage means in the conveying path between the ballast cleaning screen and the ballast bed.
Claim 16
Dependent Claim 42 words
The apparatus of claim 6, wherein the ballast storage means is a bin open on top, the bin being arranged to receive the clean ballast through the open top, and an adjustable door means in the bin for selectively relEasing stored ballast.
Claim 17
Dependent Claim 23 words
The apparatus of claim 6, wherein the ballast storage means has ballast discharge means arranged to discharge clean ballast to the ballast bed.
Claim 18
Dependent Claim 24 words
The apparatus of claim 6, wherein the ballast storage means is a bin and an adjustable wall divides the bin into two storage chambers.
Claim 19
Dependent Claim 56 words
The apparatus of claim 9, wherein one of the storage chambers has an apertured bottom, means is provided for selectively opening and closing the bottom for selective discharge of clean ballast to the ballast bed, and the conveyor system including a conveyor band having a discharge end for discharging clean ballast into the one storage chamber.
Claim 20
Dependent Claim 24 words
The apparatus of claim 10, further comprising guide means arranged to direct clean ballast from the last-named conveyor band to the other storage chamber.
Claim 21
Dependent Claim 26 words
The apparatus of claim 6, wherein the ballast storage means has ballast discharge means arranged to discharge clean ballast into successive cribs of the ballast bed.
Claim 22
Dependent Claim 30 words
The apparatus of claim 1, further comprising a pivotal discharge conveyor arranged to receive rubble at a discharge end of one of the conveyor bands and to discharge the rubble.
Claim 23
Dependent Claim 57 words
The apparatus of claim 1, further comprising lifting means mounted on the frame for lifting a section of the track above said stringer, the lifting means comprising a first track lifting means substantially vertically aligned with the stringer, and a second track lifting means mounted adjacent the first track lifting means in the direction of track elongation.

References Cited (Backward Citations)

US1793389A Cited
US2737901A Cited
US2791410A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-08-22 1976-02-21 1976-08-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-08-22 1980-02-21 1980-08-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-08-22 1984-02-21 1984-08-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag