← Back to Patent Explorer
US3674089A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for stimulating hydrocarbon-bearing formations

Assignee: Cities Service Oil Co
•
Filing: 1970-09-10
•
Granted: 1972-07-04
•
Expires: 1990-09-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An approved method is disclosed for the stimulation of formations which exhibit a high oil content and porosity, but having a low permeability and therefore poor primary production. The method comprises the placement of explosives at predetermined points within a formation so as to effectively fracture a large portion of the formation subsequent to the explosive placement and detonation. A fracture network is created with interwell communication. A well is drilled into the fracture zone and oil produced therefrom.

Inventors

  • 👤 Ted R Moore

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 07:06
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/25; E21B43/26; E21B43/263; E21B43/30

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 59 words
A method for stimulating a hydrocarbon bearing formation comprising: a. drilling one or more uncompleted wells into the formation; b. placing chemical explosive as the only explosive in the uncompleted wells and adjacent formation; c. detonating the chemical explosives; d. plugging and abandoning the uncompleted wells; and e. drilling and completing a production well within the fracture network formed.
Claim 2
Independent Claim 59 words
A method for stimulating a hydrocarbon bearing formation comprising: a. drilling one or more uncompleted wells into the formation; b. placing chemical explosive as the only explosive in the uncompleted wells and adjacent formation; c. detonating the chemical explosives; d. plugging and abandoning the uncompleted wells; and e. drilling and completing a production well within the fracture network formed.
Claim 3
Dependent Claim 11 words
The method of claim 1 in which the formation is chalk.
Claim 4
Dependent Claim 13 words
The method of claim 1 in which the chemical explosives are detonated simultaneously.
Claim 5
Dependent Claim 12 words
The method of claim 3 in which the chemical explosives are non-auto-detonating.
Claim 6
Dependent Claim 32 words
The method of claim 1 in which four uncompleted wells and a fifth completed well are drilled to form a five-spot pattern with the completed well encompassed by the four uncompleted wells.
Claim 7
Dependent Claim 11 words
The method of claim 5 in which the formation is chalk.
Claim 8
Dependent Claim 13 words
The method of claim 6 in which the chemical explosives are detonated simultaneously.
Claim 9
Dependent Claim 12 words
The method of claim 7 in which the chemical explosives are non-auto-detonating.
Claim 10
Dependent Claim 19 words
The method of claim 1 further comprising hydraulically fracturing the uncompleted wells prior to the implacement of the explosive.
Claim 11
Dependent Claim 32 words
The method of claim 9 in which four uncompleted wells and a fifth completed well are drilled to form a five-spot pattern with the completed well encompassed by the four uncompleted wells.
Claim 12
Dependent Claim 23 words
The method of claim 1 further comprising partially filling the uncompleted well with a packing material prior to detonating the explosive placed therein.

References Cited (Backward Citations)

US2676662A Cited
FR1278435A Cited
US3342257A Cited
US3332480A Cited
US3464490A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-07-04 1976-01-03 1976-07-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-07-04 1980-01-03 1980-07-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-07-04 1984-01-03 1984-07-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag