Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
104 words
A method of preparing seismic reflection sections to include velocity information comprising the steps of: 1. processing seismic signals within an automated data processing machine, 2. plotting said seismic signals within a seismic section plotter to form seismic reflection sections in accordance with the processed seismic signals in step (1), 3. determining interval velocity information relating to said seismic signals within an automated data processing machine, 4. plotting within a seismic section plotter an overlay representative of said interval velocities and having the same relative horizontal and vertical scales as said seismic reflection sections, and 5. superimposing said overlay onto said seismic reflection sections.
Claim 2
Independent Claim
104 words
A method of preparing seismic reflection sections to include velocity information comprising the steps of: 1. processing seismic signals within an automated data processing machine, 2. plotting said seismic signals within a seismic section plotter to form seismic reflection sections in accordance with the processed seismic signals in step (1), 3. determining interval velocity information relating to said seismic signals within an automated data processing machine, 4. plotting within a seismic section plotter an overlay representative of said interval velocities and having the same relative horizontal and vertical scales as said seismic reflection sections, and 5. superimposing said overlay onto said seismic reflection sections.
Claim 3
Dependent Claim
24 words
plotting said seismic signals within a seismic section plotter to form seismic reflection sections in accordance with the processed seismic signals in step (1),
Claim 4
Dependent Claim
24 words
plotting said seismic signals within a seismic section plotter to form seismic reflection sections in accordance with the processed seismic signals in step (1),
Claim 5
Dependent Claim
12 words
The method of claim 1 wherein said overlay comprises an isodepth display.
Claim 6
Dependent Claim
12 words
The method of claim 1 wherein said overlay comprises an iso-time display.
Claim 7
Dependent Claim
15 words
determining interval velocity information relating to said seismic signals within an automated data processing machine,
Claim 8
Dependent Claim
15 words
determining interval velocity information relating to said seismic signals within an automated data processing machine,
Claim 9
Dependent Claim
28 words
plotting within a seismic section plotter an overlay representative of said interval velocities and having the same relative horizontal and vertical scales as said seismic reflection sections, and
Claim 10
Dependent Claim
28 words
plotting within a seismic section plotter an overlay representative of said interval velocities and having the same relative horizontal and vertical scales as said seismic reflection sections, and
Claim 11
Dependent Claim
20 words
The method of claim 1 wherein said overlay in step (4) is a different color than said seismic reflection sections.
Claim 12
Dependent Claim
21 words
The method of claim 1 wherein steps (3), (4), and (5) are repeated a plurality of times for different velocity functions.
Claim 13
Dependent Claim
8 words
superimposing said overlay onto said seismic reflection sections.
Claim 14
Dependent Claim
8 words
superimposing said overlay onto said seismic reflection sections.
Claim 15
Dependent Claim
24 words
The method of claim 1 wherein said overlay in step (4) has the same horizontal and vertical scales as the conventional seismic reflection section.
Claim 16
Dependent Claim
20 words
The method of claim 1 wherein step (5) comprises the projecting of said overlay onto said conventional seismic reflection section.