Method for treating titanium scrap

Assignee: Crucible Materials Corp
•
Filing: 1969-05-07
•
Granted: 1972-05-02
•
Expires: 1989-05-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This is a process for melting titanium scrap to provide a material free from dense inclusions. This is accomplished by melting a quantity of titanium scrap in a crucible, maintaining the same molten for a period sufficient to either melt dense inclusions or have them in unmelted form sink to the bottom of the melt, discontinuing heating to form a solidified skull adjacent to the bottom of the melt to entrap the inclusions and then removing the inclusion-free metal from the crucible.

Inventors

  • 👤 Russell C Buehl

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 16:47
CPC Classifications
C; C22; C22B; C22B34/00; C22B34/10; C22B34/12; C22B34/1295; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 18 words
The method of claim 1 wherein heat is applied continuously during feeding of said scrap to said mold.
Claim 2
Dependent Claim 38 words
The method of claim 1 wherein at least a portion of the scrap initially introduced to the mold to initially form the molten pool is replaced with titanium sponge, whereby heat transfer through the mold walls is reduced.
Claim 3
Dependent Claim 20 words
The method of claim 1 wherein means are used for reducing heat loss from the molten pool surface during melting.
Claim 4
Dependent Claim 19 words
The method of claim 1 wherein said heating and melting is achieved by the use of a nonconsumable electrode.
Claim 5
Dependent Claim 46 words
The method of claim 1 wherein said initial scrap is introduced to the mold in an amount to provide a layer of about 4 to 6 inches thick and upon melting the periphery of the molten pool is spaced about 1 inch from the mold interior.
Claim 6
Dependent Claim 27 words
The method of claim 1 wherein said scrap is cleaned of surface contaminants and comminuted to a substantially uniform size consist prior to introduction to said mold.
Claim 7
Dependent Claim 19 words
The method of claim 1 wherein magnetic material is removed from said scrap prior to introduction to said mold.
Claim 8
Independent Claim 173 words
A method for melting titanium scrap in a nonoxidizing atmosphere to remove dense inclusions comprising preparing said scrap for melting by crushing a quantity of scrap to pieces of substantially uniform size, cleaning said scrap to remove surface contaminants and removing magnetic material from said scrap, introducing a quantity of said scrap to a mold to a depth of about 4 to 6 inches, arc melting said scrap by the use of a nonconsumable electrode to form a molten pool thereof having a periphery spaced a distance from the mold interior, feeding additional titanium scrap to said mold while continuing said aRc melting to form an increasing pool of liquid metal within said mold, discontinuing said feeding of scrap to the mold while continuing said arc melting to maintain said pool liquid and permitting unmelted dense inclusions to sink to said periphery, discontinuing said arc melting for a period of time sufficient to form a solidified metal layer adjacent said periphery and trap said inclusions therein and withdrawing liquid metal from said mold.
Claim 9
Dependent Claim 39 words
The method of claim 9 wherein at least a portion of the titanium scrap initially introduced to the mold to initially form the molten pool is replaced with titanium sponge, whereby heat transfer through the mold walls is reduced.
Claim 10
Dependent Claim 20 words
The method of claim 10 wherein means are used to reduce heat loss from the molten pool surface during melting.

References Cited (Backward Citations)

US2734244A Cited
US1918339A Cited
US2548897A Cited
US2541764A Cited
US2805148A Cited
US2727936A Cited
US2789152A Cited
US3005246A Cited
US3249425A Cited
US3406027A Cited
US3417808A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1975-05-02 1975-11-01 1976-05-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1979-05-02 1979-11-01 1980-05-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1983-05-02 1983-11-01 1984-05-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag