← Back to Patent Explorer
US3622967A Expired / Lapsed US ⏱️ 0.0 years remaining

Optimum stack

Assignee: Mobil Oil AS
•
Filing: 1968-11-07
•
Granted: 1971-11-23
•
Expires: 1988-11-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Seismic traces are weighted and stacked to produce an estimated output trace having improved signal-to-noise ratio. Those traces having the highest signal-to-noise ratio are weighted more heavily. The weights for each trace are determined from a detection of the signal between the estimated output trace and each of the seismic traces. The procedure is iterated so that the signal-to-noise ratio of the estimated output trace is progressively improved by recomputing the weights of the individual traces on each pass.

Inventors

  • 👤 Manus R Foster
  • 👤 Raymond L Sengbush

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 13:17
CPC Classifications
G; G01; G01V; G01V1/00; G01V1/28; G01V1/36; G01V1/362; G06; G06G; G06G7/00; G06G7/12; G06G7/19; G06G7/1928; G01V2210/00; G01V2210/30; G01V2210/32; G01V2210/322

Claims Analysis

Total Claims: 23
Claim 1
Independent Claim 23 words
The method of utilizing automatic computing apparatus to stack m seismic traces to produce an estimated output trace having improved signal-to-noise ratio comprisiNg:
Claim 2
Independent Claim 23 words
The method of utilizing automatic computing apparatus to stack m seismic traces to produce an estimated output trace having improved signal-to-noise ratio comprisiNg:
Claim 3
Dependent Claim 50 words
Multiplying the samples of each seismic trace by amplitude coefficients Aj which for the successive seismic traces are denoted A1, A2 ...Am where m is the number of seismic traces, and where the amplitude coefficients are initially set equal to predetermined constants to produce a signal estimate for each trace,
Claim 4
Dependent Claim 50 words
Multiplying the samples of each seismic trace by amplitude coefficients Aj which for the successive seismic traces are denoted A1, A2 ...Am where m is the number of seismic traces, and where the amplitude coefficients are initially set equal to predetermined constants to produce a signal estimate for each trace,
Claim 5
Dependent Claim 16 words
Stacking the signal estimates of all of the m traces to produce an estimated output trace,
Claim 6
Dependent Claim 16 words
Stacking the signal estimates of all of the m traces to produce an estimated output trace,
Claim 7
Dependent Claim 21 words
The method recited in claim 1 wherein each of said steps is carried out on an automatic stored program digital computer.
Claim 8
Dependent Claim 16 words
Stacking the signal estimates of all of the m traces to produce an estimated output trace,
Claim 9
Dependent Claim 16 words
Stacking the signal estimates of all of the m traces to produce an estimated output trace,
Claim 10
Dependent Claim 31 words
Detecting a signal which is a function of both said estimated output trace and each of said traces to produce new amplitude coefficients A1, A2 ... Am for each trace, and
Claim 11
Dependent Claim 31 words
Detecting a signal which is a function of both said estimated output trace and each of said traces to produce new amplitude coefficients A1, A2 ... Am for each trace, and
Claim 12
Dependent Claim 40 words
The method recited in claim 1 wherein the step of detecting the signal includes computing the zero lag correlations between said estimated output trace and each of said signal traces to produce a zero lag cross-correlation function for each trace.
Claim 13
Dependent Claim 31 words
Detecting a signal which is a function of both said estimated output trace and each of said traces to produce new amplitude coefficients A1, A2 ... Am for each trace, and
Claim 14
Dependent Claim 31 words
Detecting a signal which is a function of both said estimated output trace and each of said traces to produce new amplitude coefficients A1, A2 ... Am for each trace, and
Claim 15
Dependent Claim 20 words
Iterating steps 1 through 3 using said new amplitude coefficients to produce an estimated output trace having improved signal-to-noise ratio.
Claim 16
Dependent Claim 20 words
Iterating steps 1 through 3 using said new amplitude coefficients to produce an estimated output trace having improved signal-to-noise ratio.
Claim 17
Dependent Claim 33 words
The method recited in claim 3 wherein the zero lag cross-correlation function between said estimated output and each of said seismic traces is normalized to produce a new amplitude coefficient for each trace.
Claim 18
Dependent Claim 20 words
Iterating steps 1 through 3 using said new amplitude coefficients to produce an estimated output trace having improved signal-to-noise ratio.
Claim 19
Dependent Claim 20 words
Iterating steps 1 through 3 using said new amplitude coefficients to produce an estimated output trace having improved signal-to-noise ratio.
Claim 20
Dependent Claim 16 words
The method recited in claim 1 wherein said predetermined constants are initially set equal to 1.
Claim 21
Dependent Claim 28 words
The method recited in claim 1 wherein said predetermined constants are initially set for each trace in accordance with predetermined knowledge of the signal-to-noise ratio of each trace.
Claim 22
Dependent Claim 19 words
The method recited in claim 1 wherein the steps (1) through (3) are iterated a predetermined number of times.
Claim 23
Dependent Claim 39 words
The method recited in claim 1 wherein the steps (1) through (3) are iterated until the difference between said new amplitude coefficients and the corresponding amplitude coefficients determined from the previous iteration is less than a preset error tolerance.

References Cited (Backward Citations)

US3108250A Cited
US3398396A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-11-22 1975-05-24 1975-11-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-11-22 1979-05-24 1979-11-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-11-22 1983-05-24 1983-11-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag