← Back to Patent Explorer
US3593789A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for producing shale oil from an oil shale formation

Assignee: Shell USA Inc
•
Filing: 1968-10-18
•
Granted: 1971-07-20
•
Expires: 1988-10-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for producing shale oil from a subterranean oil shale formation by controlled in situ combustion by exploding a relatively high energy device within an oil shale formation thereby forming a fragmented vertically extensive zone of rubble having a substantially void space at the top thereof. The zone is filled with a layer of granular material for permeability adjustment and a controlled combustion front is initiated by injecting a fluid comprising a mixture of oxygen-containing gas and aqueous liquid substantially near the top of the granularfilled fragmented zone so as to advance a combustion front down the zone and produce oil shale pyrolysis products.

Inventors

  • 👤 Michael Prats

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 13:00
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/2403

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 102 words
The method of claim 1 including the steps of: igniting the hydrocarbons present in the formation adjacent the top of said fragmented zone; injecting a combustion-supporting fluid comprising a mixture of oxygen-containing gas and aqueous liquid substantially near the top of said fragmented zone thereby advancing a combustion front down said fragmented zone from the top to the bottom thereof; producing oil shale pyrolysis products from substantially the bottom of said fragmented zone; and advancing said combustion front by injecting said combustion-supporting fluid while distributing the aqueous liquid of said mixture substantially uniformly across the top of the layer of granular material.
Claim 2
Dependent Claim 18 words
The method of claim 2 including the step of recovering shale oil from said oil shale pyrolysis products.
Claim 3
Dependent Claim 30 words
The method of claim 2 wherein the step of injecting a combustion-supporting fluid includes injecting air mixed with sufficient water to limit the amount of oxygen of said combustion front.
Claim 4
Dependent Claim 63 words
The method of claim 2 wherein the step of injecting a combustion-supporting fluid includes injecting said mixture in the form of a foam comprising 0.2 percent by weight of a foaming agent in the water and the oxygen-containing gas is dispersed in the aqueous phase in a proportion of approximately 2 cubic feet of aqueous phase per 1000 standard cubic feet of air.
Claim 5
Dependent Claim 24 words
The method of claim 1 including the step of repeating the step of depositing said layer prior to producing said oil shale pyrolysis products.
Claim 6
Dependent Claim 23 words
The method of claim 1 including the step of repeating the step of depositing said layer while producing said oil shale pyrolysis products.
Claim 7
Dependent Claim 31 words
The method of claim 1 wherein the step of depositing said layer includes depositing granular materials graded into a sequence ranging from coarse to fine in moving upwardly through said layer.
Claim 8
Dependent Claim 21 words
The method of claim 1 wherein the step of depositing said layer includes depositing said layer prior to igniting said hydrocarbons.
Claim 9
Dependent Claim 82 words
The method of claim 1 including the step of extending at least one well through said formation and into communication with both said void space and substantially the bottom of said fragmented zone; packing off the communication in said well formed between said void space and the bottom of said fragmented zone; and subsequently injecting said combustion-supporting fluid down said well and through said layer and producing said oil shale pyrolysis products from the bottom of said fragmented zone up said well.
Claim 10
Dependent Claim 78 words
The method of claim 1 including the step of extending at least a first well through said formation and into communication with said void space and subsequently injecting said combustion-supporting fluid down said first well and through said layer; and extending at least a second well through said formation and into communication with the bottom of said fragmented zone and subsequently producing said oil shale pyrolysis products from the bottom of said fragmented zone and up said well.

References Cited (Backward Citations)

US2780449A Cited
US3113620A Cited
US3342257A Cited
US3465819A Cited
US3460620A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-07-19 1975-01-18 1975-07-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-07-19 1979-01-18 1979-07-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-07-19 1983-01-18 1983-07-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag