← Back to Patent Explorer
US3592631A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for treating zinc blast furnace gases

Assignee: Metallurgical Processes Ltd
•
Filing: 1968-04-11
•
Granted: 1971-07-13
•
Expires: 1988-04-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A DRY CROSSOVER DUCT WITHOUT IRRIGATION MEANS FOR CONVEYING ZINC BLAST FURNACE EXIT GASES, CONNECTS A CONDENSER WITH A SCRUBBING TOWER, THE DUCT BEING SLOPED UPWARDLY TOWARDS THE SCRUBBING TOWER TO RETURN LIQUID METAL TO THE CONDENSER. THE SCRBBING TOWER INCLUDES SPRAYS FOR COOLING AND SATURATING THE GASES IN SPACE WITHIN THE SCRUBBING TOWER IN ORDER TO AVOID ACCRETION AT THE END OF THE DUCT OR TOWER.

Inventors

  • 👤 Claude Cattelain

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 22:26
CPC Classifications
C; C22; C22B; C22B19/00; C22B19/04; C22B19/16; C22B19/18; Y; Y10; Y10S; Y10S261/00; Y10S261/09

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-07-12 1975-01-11 1975-07-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-07-12 1979-01-11 1979-07-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-07-12 1983-01-11 1983-07-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag