US3589080A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for finishing spectacle frames and parts thereof
Assignee: SHURON Inc 40 HUMBOLDT STREET ROCHESTER NEW YORK 14601 A CORP OF NEW YORK
•
Filing: 1968-06-25
•
Granted: 1971-06-29
•
Expires: 1988-06-25
Abstract
Abstract Plastic spectacle frames and parts for such frames, such as fronts, temples, and top rims are finish-polished by tumbling them in a barrel containing also scrap pieces of the plastic, pumice and conventional waxy polishing material, while maintaining the contents of the barrel refrigerated.
Inventors
- 👤 Robert S Abbey
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 19:24
CPC Classifications
B; B24; B24B; B24B31/00; B24B31/10; B24B31/06
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
42 words
A process for polishing plastic parts of spectacle frames, comprising: placing the parts in a refrigerated receptacle with scrap pieces of plastic, wax, water and a finely powdered abrasive, and effecting a tumbling operation while keeping the ingredients in the receptacle refrigerated.
Claim 2
Dependent Claim
42 words
A process for polishing plastic parts of spectacle frames, comprising: placing the parts in a refrigerated receptacle with scrap pieces of plastic, wax, water and a finely powdered abrasive, and effecting a tumbling operation while keeping the ingredients in the receptacle refrigerated.
Claim 3
Dependent Claim
18 words
A process as claimed in claim 1 wherein said scrap pieces are generally diamond-shaped and have sharp edges.
Claim 4
Dependent Claim
22 words
A process as claimed in claim 1, wherein the scrap pieces are of the same material as the parts to be polished.
Claim 5
Dependent Claim
22 words
A process as claimed in claim 3, wherein the scrap pieces of plastic are cooled prior to placing them in the receptacle.
Claim 6
Dependent Claim
73 words
A process for polishing plastic parts of spectacle frames, comprising cutting plastic top rim stock in two to form two tope rims and scrap, cooling the scrap to a temperature of about 48* F., placing a quantity of the cooled scrap, together with the parts to be polished, in a refrigerated receptacle, adding a wax to the receptacle, water, and a finely powdered abrasive, and tumbling the receptacle while keeping its contents refrigerated.
Claim 7
Dependent Claim
73 words
A process for polishing plastic parts of spectacle frames, comprising cutting plastic top rim stock in two to form two tope rims and scrap, cooling the scrap to a temperature of about 48* F., placing a quantity of the cooled scrap, together with the parts to be polished, in a refrigerated receptacle, adding a wax to the receptacle, water, and a finely powdered abrasive, and tumbling the receptacle while keeping its contents refrigerated.
Claim 8
Dependent Claim
124 words
A process for polishing plastic parts of spectacle frames, comprising cutting plastic top rim stock to form a plurality of top rims and scrap from the plastic stock, cooling the scrap to a temperature of about 48* F., placing a quantity of the scrap together with pumice, a waxy polishing material, and water in a receptacle, subjecting the contents of the receptacle to a brief tumbling operation to intermix said contents, then adding to the receptacle the plastic parts that are to be polished, and again subjecting the contents of the receptacle to a second tumbling operation for a period of time substantially greater than that of the first tumbling operation, and maintaining the contents of the receptacle refrigerated throughout the second tumbling operation.
Claim 9
Dependent Claim
124 words
A process for polishing plastic parts of spectacle frames, comprising cutting plastic top rim stock to form a plurality of top rims and scrap from the plastic stock, cooling the scrap to a temperature of about 48* F., placing a quantity of the scrap together with pumice, a waxy polishing material, and water in a receptacle, subjecting the contents of the receptacle to a brief tumbling operation to intermix said contents, then adding to the receptacle the plastic parts that are to be polished, and again subjecting the contents of the receptacle to a second tumbling operation for a period of time substantially greater than that of the first tumbling operation, and maintaining the contents of the receptacle refrigerated throughout the second tumbling operation.
References Cited (Backward Citations)
US1887026A
Cited
US2062671A
Cited
US2402967A
Cited
GB855865A
Cited
US2978850A
Cited
US3324605A
Cited
US3504124A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1974-06-28 | 1974-12-28 | 1975-06-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1978-06-28 | 1978-12-28 | 1979-06-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1982-06-28 | 1982-12-28 | 1983-06-29 | $7700.00 | Window Closed / Lapsed |