Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
224 words
An underwater well head encasement structure for mounting below the water surface and on the ocean bottom by use of a floating work vessel comprising: a tubular caisson having a lower end adjacent the ocean floor and having an upper end at a depth below the water surface within which a diver serviced by said vessel can operate; a base at the lower end of said tubular caisson; lateral supports for said tubular caisson comprising a plurality of diagonal braces having upper ends in engagement with the wall of the caisson intermediate upper and lower ends, lower ends of said braces being secured in the ocean bottom; a housing mounted on the upper end of the caisson including a side wall structure forming a chamber over said upper end, a bottom wall closing the lower side of said housing and extending over the upper end of said caisson, a plurality of drill guides extending from said bottom wall to said base, said wall structure having an upper perimetral rim forming an opening at least as large as the interior of said caisson to enable the drilling of wells through said drill guides and the setting of well casings in said wells; and a substantially annular closure for said housing having a supporting edge on the lower side in removable sealed position on said rim.
Claim 2
Dependent Claim
224 words
An underwater well head encasement structure for mounting below the water surface and on the ocean bottom by use of a floating work vessel comprising: a tubular caisson having a lower end adjacent the ocean floor and having an upper end at a depth below the water surface within which a diver serviced by said vessel can operate; a base at the lower end of said tubular caisson; lateral supports for said tubular caisson comprising a plurality of diagonal braces having upper ends in engagement with the wall of the caisson intermediate upper and lower ends, lower ends of said braces being secured in the ocean bottom; a housing mounted on the upper end of the caisson including a side wall structure forming a chamber over said upper end, a bottom wall closing the lower side of said housing and extending over the upper end of said caisson, a plurality of drill guides extending from said bottom wall to said base, said wall structure having an upper perimetral rim forming an opening at least as large as the interior of said caisson to enable the drilling of wells through said drill guides and the setting of well casings in said wells; and a substantially annular closure for said housing having a supporting edge on the lower side in removable sealed position on said rim.
Claim 3
Dependent Claim
43 words
An underwater well head encasement structure as in claim 1 wherein said diagonal braces comprise tubular columns having upper ends opening into the interior of the caisson and pilings extending from within the lower ends of respective columns downwardly into the ocean floor.
Claim 4
Dependent Claim
37 words
An underwater well head encasement structure as in claim 1 wherein said closure has a manhole on the upper side and a manhole cover in removable sealed position on said closure at a location covering said manhole.
Claim 5
Dependent Claim
31 words
An underwater well head encasement structure as in claim 1 wherein there are anchoring projections extending from said base downwardly into the ocean floor to prevent lateral shifting of said base.
Claim 6
Dependent Claim
22 words
An underwater well head encasement structure as in claim 1 wherein said base is at a location resting on the ocean floor.
Claim 7
Dependent Claim
45 words
An underwater well head encasement structure as in claim 3 wherein there are lifting attachments respectively on said annular closure and On said manhole cover to facilitate placing and removal of said annular closure and said manhole cover by operation from said floating work vessel.
Claim 8
Dependent Claim
30 words
An underwater well head encasement structure as in claim 1 wherein there is a perimetral diagonal bracing structure between the outside of said caisson and outer portions of said housing.
Claim 9
Dependent Claim
23 words
An underwater well head encasement structure as in claim 4 wherein said piling and said anchoring projections are of concrete poured in place.