← Back to Patent Explorer
US3419481A Expired / Lapsed US ⏱️ 0.0 years remaining

Electrolyte and process for electroplating black chromium and article thereby produced

Assignee: Mcgean Rohco Inc
•
Filing: 1966-04-08
•
Granted: 1968-12-31
•
Expires: 1986-04-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jr John B Nelson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 19:31
CPC Classifications
C; C25; C25D; C25D3/00; C25D3/02; C25D3/04; C25D3/08

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 89 words
A COMPOUND OF MATTER FOR USE IN THE ELECTRO-DEPOSITION OF BLACK, CHROMIUM-CONTAINING DEPOSITS WHICH IS AN AQUEOUS SOLUTION CONSISTING ESSENTIALLY OF FROM ABOUT 60 GRAMS PER LITER TO SATURATION OF CHROMIX ANHYDRIDE, A FLUORIDE-CONTAINING CATALYST IN AN AMOUNT SUFFICIENT TO SUPPLY FROM ABOUT 0.03 TO ABOUT 1 GRAM OF FLUORIDE IN SOLUTION PER LITER, AN INORGANIC NITROGEN-CONTAINING COMPOUND IN AN AMOUNT SUFFICIENT TO SUPPLY THE EQUIVALENT OF FROM ABOUT 0.35 TO ABOUT 3.5 GRAMS OF (NO2) RADICAL PER LITER, SAID AQUEOUS SOLUTION BEING SUBSTANTIALLY COMPLETELY FREE OF SULFATE IONS.
Claim 2
Dependent Claim 89 words
A COMPOUND OF MATTER FOR USE IN THE ELECTRO-DEPOSITION OF BLACK, CHROMIUM-CONTAINING DEPOSITS WHICH IS AN AQUEOUS SOLUTION CONSISTING ESSENTIALLY OF FROM ABOUT 60 GRAMS PER LITER TO SATURATION OF CHROMIX ANHYDRIDE, A FLUORIDE-CONTAINING CATALYST IN AN AMOUNT SUFFICIENT TO SUPPLY FROM ABOUT 0.03 TO ABOUT 1 GRAM OF FLUORIDE IN SOLUTION PER LITER, AN INORGANIC NITROGEN-CONTAINING COMPOUND IN AN AMOUNT SUFFICIENT TO SUPPLY THE EQUIVALENT OF FROM ABOUT 0.35 TO ABOUT 3.5 GRAMS OF (NO2) RADICAL PER LITER, SAID AQUEOUS SOLUTION BEING SUBSTANTIALLY COMPLETELY FREE OF SULFATE IONS.

References Cited (Backward Citations)

CA624887A Cited
US1975239A Cited
US2088615A Cited
DE881596C Cited
US2354746A Cited
US2623847A Cited
US2841541A Cited
US2841540A Cited
SU135319A1 Cited
JPS3922105B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1971-12-31 1972-07-01 1972-12-31 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1975-12-31 1976-07-01 1976-12-31 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1979-12-31 1980-07-01 1980-12-31 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag