← Back to Patent Explorer
US3408853A Expired / Lapsed US ⏱️ 0.0 years remaining

Portable gas analyser with time delay

Assignee: Individual
•
Filing: 1966-01-18
•
Granted: 1968-11-05
•
Expires: 1986-01-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Hubner Rolf

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 23:03
CPC Classifications
G; G01; G01N; G01N27/00; G01N27/02; G01N27/04; G01N27/14; G01N27/16; G01N1/00; G01N1/02; G01N1/22; G01N1/24

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 163 words
A CONTROL CIRCUIT FOR A PROTABLE GAS ANALYSER HAVING A MEASURING CHAMBER, ELECTRICALLY OPERABLE PUMP MEANS FOR INDUCING A FLOW OF AMBIENT GAS INTO SAID CHAMBER, AN ELECTRICALLY OPERABLE MEASURING CIRCUIT FOR DETERMINING THE CONCENTRATION OF A COMPONENT OF THE GAS INDUCED INTO SAID CHAMBER, AND INDICATOR MEANS FOR PRODUCING A READING OF THE CONCENTRATION OF SAID COMPONENT, SAID CONTROL CIRCUIT COMPRISING: A SOURCE OF ELECTRIC CURRENT; A FIRST TIMER NETWORK CONNECTED BETWEEN SAID SOURCE AND SAID PUMP MEANS AND EMERGIZABLE FOR SUPPLYING SAID PUMP MEANS WITH ELECTRIC CURRENT FROM SAID SOURCE FOR A FIRST PREDETERMINED TIME PERIOD; A SECOND TIMER NETWORK CONNECTED WITH SAID FIRST TIMER NETWORK AND ENERGIZABLE THEREBY UPON THE DEACTIVATION OF SAID PUMP MEANS; AND A THIRD TIMER NETWORK CONNECTED WITH SAID SECOND TIMER NETWORK AND ENERGIZABLE THEREBY AFTER THE ELAPSE OF A PREDETERMINED DEALY PERIOD AND INTERPOSED BETWEEN SAID MEASURING CIRCUIT AND SAID SOURCE FOR CONNECTING SAID MEASURING CIRCUIT WITH SAID SOURCE FOR A SECOND PREDETERMINED TIME PERIOD.
Claim 2
Dependent Claim 163 words
A CONTROL CIRCUIT FOR A PROTABLE GAS ANALYSER HAVING A MEASURING CHAMBER, ELECTRICALLY OPERABLE PUMP MEANS FOR INDUCING A FLOW OF AMBIENT GAS INTO SAID CHAMBER, AN ELECTRICALLY OPERABLE MEASURING CIRCUIT FOR DETERMINING THE CONCENTRATION OF A COMPONENT OF THE GAS INDUCED INTO SAID CHAMBER, AND INDICATOR MEANS FOR PRODUCING A READING OF THE CONCENTRATION OF SAID COMPONENT, SAID CONTROL CIRCUIT COMPRISING: A SOURCE OF ELECTRIC CURRENT; A FIRST TIMER NETWORK CONNECTED BETWEEN SAID SOURCE AND SAID PUMP MEANS AND EMERGIZABLE FOR SUPPLYING SAID PUMP MEANS WITH ELECTRIC CURRENT FROM SAID SOURCE FOR A FIRST PREDETERMINED TIME PERIOD; A SECOND TIMER NETWORK CONNECTED WITH SAID FIRST TIMER NETWORK AND ENERGIZABLE THEREBY UPON THE DEACTIVATION OF SAID PUMP MEANS; AND A THIRD TIMER NETWORK CONNECTED WITH SAID SECOND TIMER NETWORK AND ENERGIZABLE THEREBY AFTER THE ELAPSE OF A PREDETERMINED DEALY PERIOD AND INTERPOSED BETWEEN SAID MEASURING CIRCUIT AND SAID SOURCE FOR CONNECTING SAID MEASURING CIRCUIT WITH SAID SOURCE FOR A SECOND PREDETERMINED TIME PERIOD.

References Cited (Backward Citations)

US3266293A Cited
US3276241A Cited
US3343402A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1971-11-05 1972-05-06 1972-11-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1975-11-05 1976-05-06 1976-11-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1979-11-05 1980-05-06 1980-11-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag