← Back to Patent Explorer
US3369504A Expired / Lapsed US ⏱️ 0.0 years remaining

Boiler operation process to prevent air pollution

Assignee: Individual
•
Filing: 1965-02-23
•
Granted: 1968-02-20
•
Expires: 1985-02-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Thomas H Oster

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 05:01
CPC Classifications
F; F23; F23J; F23J7/00; B; B01; B01D; B01D53/00; B01D53/34; B01D53/46; B01D53/48; B01D53/50; B01D53/501; C; C01; C01B; C01B7/00; C01B7/01; C01B7/03; C01D; C01D5/00; C01D5/02

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 96 words
A PROCESS FOR DIMINISHING THE EMISSION OF SULPHUR DIODE FROM BOILERS DURING THE BURNING OF SULPHUR CONTAINING FUEL COMPRISING INJECTING SODIUM CHLORIDE INTO THE GAS STREAM THROUGH THE BOILER AT A LOCATION WHICH WILL RESULT IN THE VAPORIZATION OF A SUBSTANTIAL PORTION OF THE SODIUM CHLORIDE, REGULATING THE FUEL TO AIR RATIO OF THE BOILER SO THAT SUFFICIENT EXCESS AIR IS PRESENT TO OXIDIZE THE SULPHUR DIOXIDE NORMALLY FORMED TO SULPHUR TRIOXIDE, PERMITTING THE SULPHUR TRIOXIDE TO REACT AS IT IS FORMED WITH SODIUM CHLORIDE TO FORM SODIUM SULPHATE AND HYDROGEN CHLORIDE FROM THE BOILER STREAM.
Claim 2
Dependent Claim 96 words
A PROCESS FOR DIMINISHING THE EMISSION OF SULPHUR DIODE FROM BOILERS DURING THE BURNING OF SULPHUR CONTAINING FUEL COMPRISING INJECTING SODIUM CHLORIDE INTO THE GAS STREAM THROUGH THE BOILER AT A LOCATION WHICH WILL RESULT IN THE VAPORIZATION OF A SUBSTANTIAL PORTION OF THE SODIUM CHLORIDE, REGULATING THE FUEL TO AIR RATIO OF THE BOILER SO THAT SUFFICIENT EXCESS AIR IS PRESENT TO OXIDIZE THE SULPHUR DIOXIDE NORMALLY FORMED TO SULPHUR TRIOXIDE, PERMITTING THE SULPHUR TRIOXIDE TO REACT AS IT IS FORMED WITH SODIUM CHLORIDE TO FORM SODIUM SULPHATE AND HYDROGEN CHLORIDE FROM THE BOILER STREAM.

References Cited (Backward Citations)

US896875A Cited
US1377363A Cited
US2537558A Cited
US2566320A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1971-02-19 1971-08-21 1972-02-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1975-02-19 1975-08-21 1976-02-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1979-02-19 1979-08-21 1980-02-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag