← Back to Patent Explorer
US3358441A Expired / Lapsed US ⏱️ 0.0 years remaining

Efficient part power gas turbine powerplant

Assignee: General Electric Co
•
Filing: 1966-07-11
•
Granted: 1967-12-19
•
Expires: 1986-07-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jr William Bruce Gist

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 19:45
CPC Classifications
F; F02; F02C; F02C7/00; F02C7/36; F02C3/00; F02C3/04; F02C3/107; F02C6/00; F02C6/02; F05; F05D; F05D2260/00; F05D2260/40; F05D2260/402; F05D2260/4023; Y; Y02; Y02T; Y02T50/00; Y02T50/60

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 135 words
A GAS TURBINE POWER PLANT COMPRISING: PRIMARY GAS TURBINE MEANS INCLUDING A PRIMARY POWER TURBINE, SECONDARY GAS TURBINE MEANS INCLUDING A SECONDARY COMPRESSOR, A SECONDARY COMBUSTOR, AND A SECONDARY POWER TURBINE SERIALLY ARRANGED IN FLUID FLOW RELATIONSHIP, POWER OUTPUT MEANS, AND POWER TRANSMISSION MEANS HAVING FIRST AND SECOND MODES OF OPERATION, SAID POWER TRANSMISSION MEANS IN SAID FIRST MODE OF OPERATION INTERCONNECTING SAID PRIMARY POWER TURBINE AND SAID POWER OUTPUT MEANS TO TRANSMIT POWER FROM SAID PRIMARY GAS TURBINE MEANS TO SAID POWER OUTPUT MEANS, AND SAID POWER TRANSMISSION MEANS IN SAID SECOND MODE OF OPERATION INTERCONNECTING SAID PRIMARY POWER TURBINE AND SAID SECONDARY COMPRESSOR TO DRIVE SAID SECONDARY COMPRESSOR AND INTERCONNECTING SAID SECONDARY POWER TURBINE AND SAID POWER OUTPUT MEANS TO TRANSMIT POWER FROM SAID SECONDARY GAS TURBINE MEANS TO SAID POWER OUTPUT MEANS.
Claim 2
Dependent Claim 135 words
A GAS TURBINE POWER PLANT COMPRISING: PRIMARY GAS TURBINE MEANS INCLUDING A PRIMARY POWER TURBINE, SECONDARY GAS TURBINE MEANS INCLUDING A SECONDARY COMPRESSOR, A SECONDARY COMBUSTOR, AND A SECONDARY POWER TURBINE SERIALLY ARRANGED IN FLUID FLOW RELATIONSHIP, POWER OUTPUT MEANS, AND POWER TRANSMISSION MEANS HAVING FIRST AND SECOND MODES OF OPERATION, SAID POWER TRANSMISSION MEANS IN SAID FIRST MODE OF OPERATION INTERCONNECTING SAID PRIMARY POWER TURBINE AND SAID POWER OUTPUT MEANS TO TRANSMIT POWER FROM SAID PRIMARY GAS TURBINE MEANS TO SAID POWER OUTPUT MEANS, AND SAID POWER TRANSMISSION MEANS IN SAID SECOND MODE OF OPERATION INTERCONNECTING SAID PRIMARY POWER TURBINE AND SAID SECONDARY COMPRESSOR TO DRIVE SAID SECONDARY COMPRESSOR AND INTERCONNECTING SAID SECONDARY POWER TURBINE AND SAID POWER OUTPUT MEANS TO TRANSMIT POWER FROM SAID SECONDARY GAS TURBINE MEANS TO SAID POWER OUTPUT MEANS.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-12-18 1971-06-19 1971-12-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-12-18 1975-06-19 1975-12-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-12-18 1979-06-19 1979-12-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag