← Back to Patent Explorer
US3353631A Expired / Lapsed US ⏱️ 0.0 years remaining

Elevator dispatch control using integrated stop time as a measure of traffic

Assignee: Toledo Scale Corp
•
Filing: 1959-03-30
•
Granted: 1967-11-21
•
Expires: 1979-03-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Raymond A Burgy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 09:45
CPC Classifications
B; B66; B66B; B66B1/00; B66B1/02; B66B1/06; B66B1/14; B66B1/18; B66B1/20

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 111 words
AN ELEVATOR SYSTEM COMPRISING A CAR, A PLURALITY OF LANDINGS SERVED BY SAID CAR WHILE TRAVELING UPWARD AND DOWNWARD, A SOURCE OF CURRENT, A FIRST AND SECOND CAPACITANCE CONNECTED IN SERIES ACROSS SAID SOURCE, A FIRST AND SECOND RESISTANCE CONNECTED IN SERIES ACROSS SAID SOURCE, A CONNECTION BETWEEN THE JUNCTION OF SAID CAPACITANCES AND THE JUNCTION OF SAID RESISTANCES, MEANS TO ALTER THE RESISTANCE ACROSS SAID FIRST CAPACITANCE DURING STOP TIME FOR UPWARD CAR TRAVEL, MEANS TO ALTER THE RESISTANCE ACROSS SAID SECOND CAPACITANCE DURING STOP TIME FOR DOWNWARD CAR TRAVEL, AND MEANS RESPONSIVE TO THE VOLTAGE ACROSS ONE OF SAID CAPACITANCES FOR ALTERING THE MODE OF OPERATION OF SAID SYSTEM.
Claim 2
Dependent Claim 111 words
AN ELEVATOR SYSTEM COMPRISING A CAR, A PLURALITY OF LANDINGS SERVED BY SAID CAR WHILE TRAVELING UPWARD AND DOWNWARD, A SOURCE OF CURRENT, A FIRST AND SECOND CAPACITANCE CONNECTED IN SERIES ACROSS SAID SOURCE, A FIRST AND SECOND RESISTANCE CONNECTED IN SERIES ACROSS SAID SOURCE, A CONNECTION BETWEEN THE JUNCTION OF SAID CAPACITANCES AND THE JUNCTION OF SAID RESISTANCES, MEANS TO ALTER THE RESISTANCE ACROSS SAID FIRST CAPACITANCE DURING STOP TIME FOR UPWARD CAR TRAVEL, MEANS TO ALTER THE RESISTANCE ACROSS SAID SECOND CAPACITANCE DURING STOP TIME FOR DOWNWARD CAR TRAVEL, AND MEANS RESPONSIVE TO THE VOLTAGE ACROSS ONE OF SAID CAPACITANCES FOR ALTERING THE MODE OF OPERATION OF SAID SYSTEM.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-11-20 1971-05-22 1971-11-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-11-20 1975-05-22 1975-11-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-11-20 1979-05-22 1979-11-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag