US3352498A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Explosive shattering method and apparatus
Assignee: Raymond Kaiser Engineers Inc
•
Filing: 1965-12-16
•
Granted: 1967-11-14
•
Expires: 1985-12-16
Abstract
No abstract record available.
Inventors
- 👤 Elwood V Schulte
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-30 11:25
CPC Classifications
B; B02; B02C; B02C19/00; B02C19/06
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
221 words
THE METHOD FOR CONTINUOUSLY COMMINUTING FRIABLE MATERIAL COMPRISING THE STEPS OF: (A) FILLING A FIRST VESSEL WITH A FIRST QUANTITY OF FRIABLE MATERIAL; (B) DISCHARGING SAID FIRST QUANTITY OF MATERIAL INTO A SECOND VESSEL; (C) PRESSURIZING WITH A GAS SAID SECOND VESSEL AND SIMULTANEOUSLY COMMENCE REFILLING SAID FIRST VESSEL WITH A SECOND QUANTITY OF SAID MATERIAL; (D) DISCHARGING THE PRESSURIZED FIRST QUANTITY OF MATERIAL FROM SAID SECOND VESSEL INTO A THIRD VESSEL WHEREBY, THE PRESSURES IN SAID SECOND AND THIRD VESSELS BECOME SUBSTANTIALLY EQUAL; (E) TERMINATING THE FLOW OF SAID FIRST QUANTITY OF MATERIAL INTO SAID THIRD VESSEL AND SIMULTANEOUSLY TERMINATING THE FLOW OF SAID SECOND QUANTITY OF MATERIAL INTO SAID FIRST VESSEL AND SIMULTANEOUSLY COMMENCE DISCHARGING SAID SECOND QUANTITY OF MATERIAL FROM SAID FIRST VESSEL INTO SAID SECOND VESSEL AND SIMULTANEOUSLY COMMENCE DISCHARGING THE FIRST QUANTITY OF MATERIAL AT A SELECTED RATE FROM SAID THIRD VESSEL INTO A CONDUIT WHEREIN FLOWS PRESSURIZED GASEOUS FLUID, SAID MATERIAL BEING CONVEYED IN SAID CONDUIT TOWARD A FOURTH VESSEL; (F) PASSING SAID FLOWING MATERIAL FLOWING THROUGH A VELOCITY INCREASING SECTION IN SAID CONDUIT AND THEREAFTER DISCHARGING INTO SAID FOURTH VESSEL WHEREIN THE PRESSURE IS LOWER THAN THE PRESSURE IN SAID CONDUIT AHEAD OF SAID SECTION, SAID MATERIAL BEING SUBJECTED TO THE EFFECT OF EXPLOSIVE SHATTERING FORCES AND DISINTEGRATING THE DISCRETE PARTICLES OF SAID MATERIAL;
Claim 2
Independent Claim
221 words
THE METHOD FOR CONTINUOUSLY COMMINUTING FRIABLE MATERIAL COMPRISING THE STEPS OF: (A) FILLING A FIRST VESSEL WITH A FIRST QUANTITY OF FRIABLE MATERIAL; (B) DISCHARGING SAID FIRST QUANTITY OF MATERIAL INTO A SECOND VESSEL; (C) PRESSURIZING WITH A GAS SAID SECOND VESSEL AND SIMULTANEOUSLY COMMENCE REFILLING SAID FIRST VESSEL WITH A SECOND QUANTITY OF SAID MATERIAL; (D) DISCHARGING THE PRESSURIZED FIRST QUANTITY OF MATERIAL FROM SAID SECOND VESSEL INTO A THIRD VESSEL WHEREBY, THE PRESSURES IN SAID SECOND AND THIRD VESSELS BECOME SUBSTANTIALLY EQUAL; (E) TERMINATING THE FLOW OF SAID FIRST QUANTITY OF MATERIAL INTO SAID THIRD VESSEL AND SIMULTANEOUSLY TERMINATING THE FLOW OF SAID SECOND QUANTITY OF MATERIAL INTO SAID FIRST VESSEL AND SIMULTANEOUSLY COMMENCE DISCHARGING SAID SECOND QUANTITY OF MATERIAL FROM SAID FIRST VESSEL INTO SAID SECOND VESSEL AND SIMULTANEOUSLY COMMENCE DISCHARGING THE FIRST QUANTITY OF MATERIAL AT A SELECTED RATE FROM SAID THIRD VESSEL INTO A CONDUIT WHEREIN FLOWS PRESSURIZED GASEOUS FLUID, SAID MATERIAL BEING CONVEYED IN SAID CONDUIT TOWARD A FOURTH VESSEL; (F) PASSING SAID FLOWING MATERIAL FLOWING THROUGH A VELOCITY INCREASING SECTION IN SAID CONDUIT AND THEREAFTER DISCHARGING INTO SAID FOURTH VESSEL WHEREIN THE PRESSURE IS LOWER THAN THE PRESSURE IN SAID CONDUIT AHEAD OF SAID SECTION, SAID MATERIAL BEING SUBJECTED TO THE EFFECT OF EXPLOSIVE SHATTERING FORCES AND DISINTEGRATING THE DISCRETE PARTICLES OF SAID MATERIAL;
References Cited (Backward Citations)
US1883218A
Cited
US2265622A
Cited
US2392019A
Cited
US2315083A
Cited
US2386401A
Cited
US2662007A
Cited
US2668669A
Cited
US2515542A
Cited
US2826369A
Cited
US3207447A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-11-13 | 1971-05-15 | 1971-11-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-11-13 | 1975-05-15 | 1975-11-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-11-13 | 1979-05-15 | 1979-11-14 | $7700.00 | Window Closed / Lapsed |