← Back to Patent Explorer
US3351216A Expired / Lapsed US ⏱️ 0.0 years remaining

Concrete block stacking machine

Assignee: Builders Equipment Co
•
Filing: 1964-11-25
•
Granted: 1967-11-07
•
Expires: 1984-11-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Paul M Thomas
  • 👤 Lawrence W Wright
  • 👤 Russell W Burge
  • 👤 Eugene E Crile

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 06:28
CPC Classifications
B; B65; B65G; B65G57/00; B65G57/02; B65G57/16; B65G57/20; B65G57/22; B65G57/24; B65G57/245; Y; Y10; Y10S; Y10S414/00; Y10S414/10; Y10S414/102; Y10S414/103; Y10S414/105; Y10S414/106; Y10S414/11

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 157 words
IN A BLOCK STACKING MACHINE THE COMBINATION OF: A MAIN FRAME; A VERTICALLY MOVABLE ELEVATOR THEREON; A HORIZONTALLY MOVABLE DECK MEANS MOVABLE OVER SAID ELEVATOR; FIRST MEANS FOR RESTRAINING BLOCKS ON SAID DECK MEANS TO A POSITION OVER SAID ELEVATOR; SECOND MEANS FOR RETRACTING SAID DECK FROM BELOW BLOCKS THEREON THE THEREBY DEPOSIT SAID BLOCKS ON SAID ELEVATOR; A DEPOSITING TAPERED EDGE MEANS CARRIED BY SAID DECK AND DISPOSED AT AN EDGE OF SAID DECK FROM WHICH BLOCKS ARE DEPOSITED FROM SAID DECK AND ONTO SAID ELEVATOR; AND THIRD MEANS PIVOTALLY MOUNTING SAID TAPERED EDGE MEANS RELATIVE TO SAID DECK AND ON A SUBSTANTIALLY HORIZONTAL AXIS; DECK LOADING MEANS DISPOSED AT A LEVEL TO LOAD BLOCK ONTO SAID TAPERED EDGE MEANS, SAID TAPERED EDGE MEANS AND SAID DECK MOVABLE TOWARD AND AWAY FROM SAID LOADING MEANS; AND OPERATING MEANS FOR HOLDING SAID TAPERED EDGE MEANS UPWARDLY AT SAID LEVEL, WHEN ADJACENT SAID DECK LOADING MEANS, AND TO
Claim 2
Dependent Claim 157 words
IN A BLOCK STACKING MACHINE THE COMBINATION OF: A MAIN FRAME; A VERTICALLY MOVABLE ELEVATOR THEREON; A HORIZONTALLY MOVABLE DECK MEANS MOVABLE OVER SAID ELEVATOR; FIRST MEANS FOR RESTRAINING BLOCKS ON SAID DECK MEANS TO A POSITION OVER SAID ELEVATOR; SECOND MEANS FOR RETRACTING SAID DECK FROM BELOW BLOCKS THEREON THE THEREBY DEPOSIT SAID BLOCKS ON SAID ELEVATOR; A DEPOSITING TAPERED EDGE MEANS CARRIED BY SAID DECK AND DISPOSED AT AN EDGE OF SAID DECK FROM WHICH BLOCKS ARE DEPOSITED FROM SAID DECK AND ONTO SAID ELEVATOR; AND THIRD MEANS PIVOTALLY MOUNTING SAID TAPERED EDGE MEANS RELATIVE TO SAID DECK AND ON A SUBSTANTIALLY HORIZONTAL AXIS; DECK LOADING MEANS DISPOSED AT A LEVEL TO LOAD BLOCK ONTO SAID TAPERED EDGE MEANS, SAID TAPERED EDGE MEANS AND SAID DECK MOVABLE TOWARD AND AWAY FROM SAID LOADING MEANS; AND OPERATING MEANS FOR HOLDING SAID TAPERED EDGE MEANS UPWARDLY AT SAID LEVEL, WHEN ADJACENT SAID DECK LOADING MEANS, AND TO

References Cited (Backward Citations)

US2527024A Cited
US2815870A Cited
US2979872A Cited
US3245557A Cited
US3212658A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-11-06 1971-05-08 1971-11-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-11-06 1975-05-08 1975-11-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-11-06 1979-05-08 1979-11-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag