US3334538A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Sequential time delay display device
Assignee: Institut fuer Plasmaphysik GmbH
•
Filing: 1963-05-06
•
Granted: 1967-08-08
•
Expires: 1983-05-06
Abstract
No abstract record available.
Inventors
- 👤 Steinhausen Adelfried
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 02:24
CPC Classifications
G; G01; G01V; G01V1/00; G01V1/24; G01J; G01J11/00; G01J3/00; G01J3/28; G01J3/2889
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
122 words
A METHOD FOR DISPLAYING HOW RAPIDLY CHANGING ENERGY IS DISTRIBUTED, WHICH ENERGY IS SUBSTANTIALLY ONE DIMENSIONAL IN A DIRECTION TRANSVERSE TO THE DIRECTION OF PROPAGATION AND IS PROPAGATED DURING A CERTAIN SHORT TIME PERIOD AND WITH A CERTAIN SPEED, COMPRISING THE STEPS OF: DIVIDING, IN THE SUBSTANTIALLY ONE DIMENSIONAL DIRECTION, THE LINEAR DISTRIBUTION OF ENERGY WHICH APPEARS DURING SUCH TIME PERIOD INTO A NUMBER OF ENERGY SECTIONS CORRESPONDING TO THE DESIRED RESOLUTION; DELAYING THE ENERGY OF THE SECTIONS SUCCESSIVELY BY INTERVALS WHICH, IN RELATION TO THE OCCURRENCE OF THE ENERGY DURING SUCH TIME PERIOD, INCREASE FROM SECTION TO SECTION, THE DURATION BETWEEN INTERVALS BEING AT LEAST EQUAL TO SAID TIME PERIOD; AND DISPLAYING THE ENERGY OF THE RESPECTIVELY SUCCESSIVELY DELAYED ENERGY SECTIONS.
Claim 2
Independent Claim
122 words
A METHOD FOR DISPLAYING HOW RAPIDLY CHANGING ENERGY IS DISTRIBUTED, WHICH ENERGY IS SUBSTANTIALLY ONE DIMENSIONAL IN A DIRECTION TRANSVERSE TO THE DIRECTION OF PROPAGATION AND IS PROPAGATED DURING A CERTAIN SHORT TIME PERIOD AND WITH A CERTAIN SPEED, COMPRISING THE STEPS OF: DIVIDING, IN THE SUBSTANTIALLY ONE DIMENSIONAL DIRECTION, THE LINEAR DISTRIBUTION OF ENERGY WHICH APPEARS DURING SUCH TIME PERIOD INTO A NUMBER OF ENERGY SECTIONS CORRESPONDING TO THE DESIRED RESOLUTION; DELAYING THE ENERGY OF THE SECTIONS SUCCESSIVELY BY INTERVALS WHICH, IN RELATION TO THE OCCURRENCE OF THE ENERGY DURING SUCH TIME PERIOD, INCREASE FROM SECTION TO SECTION, THE DURATION BETWEEN INTERVALS BEING AT LEAST EQUAL TO SAID TIME PERIOD; AND DISPLAYING THE ENERGY OF THE RESPECTIVELY SUCCESSIVELY DELAYED ENERGY SECTIONS.
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-08-07 | 1971-02-06 | 1971-08-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-08-07 | 1975-02-06 | 1975-08-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-08-07 | 1979-02-06 | 1979-08-08 | $7700.00 | Window Closed / Lapsed |