← Back to Patent Explorer
US3331909A Expired / Lapsed US ⏱️ 0.0 years remaining

Apparatus for energizing an induction melting furnace with a three phase electrical network

Assignee: Ohio Crankshaft Co
•
Filing: 1965-03-12
•
Granted: 1967-07-18
•
Expires: 1985-03-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Robert J Kasper

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 18:06
CPC Classifications
H; H05; H05B; H05B6/00; H05B6/02; H05B6/06; H05B6/067

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 108 words
IN THE COMBINATION OF A CORELESS INDUCTION MELTING FURNACE HAVING A HEATING COIL AND A METAL RECEIVING CHAMBER COTERMINOUS WITH SAID COIL, AND A THREE PHASE NETWORK FOR ENERGIZING SAID COIL, THE IMPROVEMENT COMPRISING: SAID HEATING COIL BEING INDIVIDED INTO AN ACTIVE MELTING SECTION AND AN INACTIVE, NON-MELTING SECTION, A TUNING CAPACITOR BEING CONNECTED ACROSS SAID ACTIVE, MELTING SECTION, SAID INACTIVE NON-MELTING SECTION BEING UNTUNED TO EXHIBIT AN INDUCTIVE, SUBSTANTIALLY WATTLESS LOAD, SAID TUNED ACTIVE MELTING SECTION OF SAID COIL BEING CONNECTED IN A FIRST PHASE OF SAID THREE PHASE NETWORK, AND SAID UNTUNED INACTIVE, NON-MELTING SECTION BEING CONNECTED IN A SECTION PHASE OF SAID THREE PHASE NETWORK.
Claim 2
Dependent Claim 108 words
IN THE COMBINATION OF A CORELESS INDUCTION MELTING FURNACE HAVING A HEATING COIL AND A METAL RECEIVING CHAMBER COTERMINOUS WITH SAID COIL, AND A THREE PHASE NETWORK FOR ENERGIZING SAID COIL, THE IMPROVEMENT COMPRISING: SAID HEATING COIL BEING INDIVIDED INTO AN ACTIVE MELTING SECTION AND AN INACTIVE, NON-MELTING SECTION, A TUNING CAPACITOR BEING CONNECTED ACROSS SAID ACTIVE, MELTING SECTION, SAID INACTIVE NON-MELTING SECTION BEING UNTUNED TO EXHIBIT AN INDUCTIVE, SUBSTANTIALLY WATTLESS LOAD, SAID TUNED ACTIVE MELTING SECTION OF SAID COIL BEING CONNECTED IN A FIRST PHASE OF SAID THREE PHASE NETWORK, AND SAID UNTUNED INACTIVE, NON-MELTING SECTION BEING CONNECTED IN A SECTION PHASE OF SAID THREE PHASE NETWORK.

References Cited (Backward Citations)

US1926811A Cited
US2741690A Cited
US3040231A Cited
US3053920A Cited
US3265958A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-07-17 1971-01-16 1971-07-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-07-17 1975-01-16 1975-07-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-07-17 1979-01-16 1979-07-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag