← Back to Patent Explorer
US3331681A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of making steel

Assignee: Dravo Corp
•
Filing: 1964-07-06
•
Granted: 1967-07-18
•
Expires: 1984-07-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Mobley Loreley Spencer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 10:08
CPC Classifications
C; C21; C21C; C21C1/00; C21C1/02; B; B22; B22D; B22D41/00; B22D41/12; C21C1/06; C21C5/00; C21C5/28; C21C5/285; C21C5/30; C21C5/32; C21C5/42; C21C5/46; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 149 words
THE PROCESS FOR EFFECTING CONVERSION OF A FERROUS CHARGE TO STEEL WITH OXYGEN WHICH COMPRISES STATIONING ONE MOBILE FURNACE AT A REFINING STATION AND ENTERING A LANCE THROUGH WHICH A GAS COMPRISING OXYGEN IS INTRODUCED INTO THE FURNACE AT SUCH STATION, POSITIONING ANOTHER SIMILAR MOBILE FURNACE CONTAINING A CHARGE OF SCRAP AT A SECOND STATION IMMEDIATELY BEHIND THE FIRST, WITHDRAWING GASES FROM THE FIRST FURNANCE THROUGH THE SECOND TO PREHEAT THE SCRAP IN THE SECOND, CHARGING MOLTEN METAL INTO THE SECOND FURNACE WHEN THE SCRAP HAS BEEN HEATED AND THE REFINING OPERATION IN THE FIRST IS COMPLETE, ADVANCING THE FIRST FURNACE BEYOND THE FIRST STATION THE REFINING IS COMPLETED, ADVANCING THE SECOND FURNACE TO THE REFINING STATION, AND MOVING A THIRD SIMILAR MOBILE FURNACE TO THE POSITION FORMERLY OCCUPIED BY THE SECOND AND REPEATING THE CYCLE OF REFINING IN ONE FURNACE AND PREHEATING THE SCRAP IN THE SUCCEEDING ONE.
Claim 2
Dependent Claim 149 words
THE PROCESS FOR EFFECTING CONVERSION OF A FERROUS CHARGE TO STEEL WITH OXYGEN WHICH COMPRISES STATIONING ONE MOBILE FURNACE AT A REFINING STATION AND ENTERING A LANCE THROUGH WHICH A GAS COMPRISING OXYGEN IS INTRODUCED INTO THE FURNACE AT SUCH STATION, POSITIONING ANOTHER SIMILAR MOBILE FURNACE CONTAINING A CHARGE OF SCRAP AT A SECOND STATION IMMEDIATELY BEHIND THE FIRST, WITHDRAWING GASES FROM THE FIRST FURNANCE THROUGH THE SECOND TO PREHEAT THE SCRAP IN THE SECOND, CHARGING MOLTEN METAL INTO THE SECOND FURNACE WHEN THE SCRAP HAS BEEN HEATED AND THE REFINING OPERATION IN THE FIRST IS COMPLETE, ADVANCING THE FIRST FURNACE BEYOND THE FIRST STATION THE REFINING IS COMPLETED, ADVANCING THE SECOND FURNACE TO THE REFINING STATION, AND MOVING A THIRD SIMILAR MOBILE FURNACE TO THE POSITION FORMERLY OCCUPIED BY THE SECOND AND REPEATING THE CYCLE OF REFINING IN ONE FURNACE AND PREHEATING THE SCRAP IN THE SUCCEEDING ONE.

References Cited (Backward Citations)

US3060014A Cited
US3013789A Cited
US3257105A Cited
US3231369A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-07-17 1971-01-16 1971-07-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-07-17 1975-01-16 1975-07-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-07-17 1979-01-16 1979-07-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag