Direct smelting of metallic ores

Assignee: Individual
•
Filing: 1966-08-04
•
Granted: 1967-06-20
•
Expires: 1986-08-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Howard K Worner

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 22:13
CPC Classifications
C; C22; C22B; C22B19/00; C22B19/04; C03; C03B; C03B5/00; C03B5/04; C03B5/12; C21; C21B; C21B13/00; C21B13/10; C22B13/00; C22B23/00; C22B23/02; C22B23/025; C22B25/00; C22B5/00; C22B9/00; Y; Y02; Y02P; Y02P10/00; Y02P10/10; Y02P10/134; Y10; Y10S; Y10S75/00; Y10S75/957

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 165 words
A METHOD FOR THE CONTINUOUS PRODUCTION OF METALS FROM ORES COMPRISING THE STEPS OF PROVIDING IN A BATH OF MOLTEN MATERIAL A SMELTING ZONE, A REFINING ZONE AND A SLAG SEPARATION ZONE, THE SAID ZONES BEING SUBSTANTIALLY SEPARATE FROM BUT IN COMMUNICATION WITH EACH OTHER; INTRODUCING ORE SUBSTANTIALLY CONTINUOUSLY INTO THE MOLTEN MATERIAL IN THE SMELTING ZONE AND SMELTING THE ORE OR CONCENTRATE IN SAID ZONE; INCLUDING TURBULENCE AND CIRCULATION OF THE MOLTEN MATERIAL IN THE SMELTING ZONE; CAUSING MOLTEN MATERIAL TO FLOW IN A STREAM CONTINUOUSLY FROM THE SMELTING ZONE TO THE REFINING ZONE; INJECTING AN OXYGEN-CONTAINING GAS INTO THE STREAM OF MOLTEN MATERIAL IN THE REFINING ZONE; CAUSING SLAG PRODUCED TO FLOW SUBSTANTIALLY CONTINUOUSLY TO THE SLAG SEPARATION ZONE; INDUCING FLOW OF SLAG COUNTER-CURRENT TO THE FLOW OF MOLTEN METAL IN AT LEAST A PART OF THE REFINING ZONE; MAINTAINING SUBSTANTIALLY QUIESCENT CONDITIONS IN THE SLAG SEPARATION ZONE; WITHDRAWING SLAG FROM THE SLAG SEPARATION ZONE; AND WITHDRAWING MOLTEN METAL FROM THE REFINING ZONE.
Claim 2
Independent Claim 165 words
A METHOD FOR THE CONTINUOUS PRODUCTION OF METALS FROM ORES COMPRISING THE STEPS OF PROVIDING IN A BATH OF MOLTEN MATERIAL A SMELTING ZONE, A REFINING ZONE AND A SLAG SEPARATION ZONE, THE SAID ZONES BEING SUBSTANTIALLY SEPARATE FROM BUT IN COMMUNICATION WITH EACH OTHER; INTRODUCING ORE SUBSTANTIALLY CONTINUOUSLY INTO THE MOLTEN MATERIAL IN THE SMELTING ZONE AND SMELTING THE ORE OR CONCENTRATE IN SAID ZONE; INCLUDING TURBULENCE AND CIRCULATION OF THE MOLTEN MATERIAL IN THE SMELTING ZONE; CAUSING MOLTEN MATERIAL TO FLOW IN A STREAM CONTINUOUSLY FROM THE SMELTING ZONE TO THE REFINING ZONE; INJECTING AN OXYGEN-CONTAINING GAS INTO THE STREAM OF MOLTEN MATERIAL IN THE REFINING ZONE; CAUSING SLAG PRODUCED TO FLOW SUBSTANTIALLY CONTINUOUSLY TO THE SLAG SEPARATION ZONE; INDUCING FLOW OF SLAG COUNTER-CURRENT TO THE FLOW OF MOLTEN METAL IN AT LEAST A PART OF THE REFINING ZONE; MAINTAINING SUBSTANTIALLY QUIESCENT CONDITIONS IN THE SLAG SEPARATION ZONE; WITHDRAWING SLAG FROM THE SLAG SEPARATION ZONE; AND WITHDRAWING MOLTEN METAL FROM THE REFINING ZONE.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-06-19 1970-12-19 1971-06-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-06-19 1974-12-19 1975-06-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-06-19 1978-12-19 1979-06-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag