US3306037A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Hydraulic fuel control
Assignee: RTX Corp
•
Filing: 1965-04-02
•
Granted: 1967-02-28
•
Expires: 1985-04-02
Abstract
No abstract record available.
Inventors
- 👤 William E Fortmann
- 👤 Charles F Stearns
- 👤 Jr James S Sims
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 13:18
CPC Classifications
F; F02; F02C; F02C9/00; F02C9/16; F02K; F02K3/00
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
159 words
FOR A TURBINE TYPE POWER PLANT HAVING A COMPRESSOR AND A TURBINE DRIVING THE COMPRESSOR, A FUEL CONTROL HAVING A HYDRAULIC COMPUTING SYSTEM COMPRISING A PLURALITY OF PARALLELLY DISPOSED FLUID PASSAGES ALL OF WHICH COMMUNICATE WITH A COMMON INLET PASSAGE AND A COMMON OUTLET PASSAGE CONNECTED TO SAID POWER PLANT, A FUEL METERING VALVE IN SAID COMMON OUTLET PASSAGE FOR REGULATING THE FLUID PASSING THERETHROUGH, SPACED VALVE MEANS SERIALLY DISPOSED IN ONE OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING A HYDRAULIC PRESSURE INDICATIVE OF A DESIRED W/P SURGE SCHEDULE, WHERE W=FUEL FLOW IN POUNDS PER HOUR, AND P=COMPRESSOR DISCHARGE PRESSURE, SPACED VALVE MEANS SERIALLY DISPOSED IN ANOTHER OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING A DESIRED W/P OVERTEMPERATURE SCHEDULE, SPACED VALVE MEANS SERIALLY DISPOSED IN ANOTHER OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING AN ACTUAL W/P VALUE, AND CONTROL MEANS FOR COMPARING SAID ACTUAL W/P VALUE WITH SAID W/P SURGE SCHEDULE OR SAID W/P OVERTEMPERATURE SCHEDULE FOR CONTROLLING SAID FUEL METERING VALVE.
Claim 2
Dependent Claim
159 words
FOR A TURBINE TYPE POWER PLANT HAVING A COMPRESSOR AND A TURBINE DRIVING THE COMPRESSOR, A FUEL CONTROL HAVING A HYDRAULIC COMPUTING SYSTEM COMPRISING A PLURALITY OF PARALLELLY DISPOSED FLUID PASSAGES ALL OF WHICH COMMUNICATE WITH A COMMON INLET PASSAGE AND A COMMON OUTLET PASSAGE CONNECTED TO SAID POWER PLANT, A FUEL METERING VALVE IN SAID COMMON OUTLET PASSAGE FOR REGULATING THE FLUID PASSING THERETHROUGH, SPACED VALVE MEANS SERIALLY DISPOSED IN ONE OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING A HYDRAULIC PRESSURE INDICATIVE OF A DESIRED W/P SURGE SCHEDULE, WHERE W=FUEL FLOW IN POUNDS PER HOUR, AND P=COMPRESSOR DISCHARGE PRESSURE, SPACED VALVE MEANS SERIALLY DISPOSED IN ANOTHER OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING A DESIRED W/P OVERTEMPERATURE SCHEDULE, SPACED VALVE MEANS SERIALLY DISPOSED IN ANOTHER OF SAID PARALLEL DISPOSED PASSAGES ESTABLISHING AN ACTUAL W/P VALUE, AND CONTROL MEANS FOR COMPARING SAID ACTUAL W/P VALUE WITH SAID W/P SURGE SCHEDULE OR SAID W/P OVERTEMPERATURE SCHEDULE FOR CONTROLLING SAID FUEL METERING VALVE.
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-02-27 | 1970-08-29 | 1971-02-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-02-27 | 1974-08-29 | 1975-02-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-02-27 | 1978-08-29 | 1979-02-28 | $7700.00 | Window Closed / Lapsed |