← Back to Patent Explorer
US3302938A Expired / Lapsed US ⏱️ 0.0 years remaining

Cement production in a rotary kiln

Assignee: BENDY ENGINEERING Co
•
Filing: 1965-01-25
•
Granted: 1967-02-07
•
Expires: 1985-01-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Wilfred R Bendy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 04:21
CPC Classifications
F; F27; F27B; F27B7/00; F27B7/20; F27B7/32; F27B7/3205; F27D; F27D3/00; F27D3/18; F27D3/16; F27D2003/168; F27D2003/169; F27D21/00; F27D21/0014

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 161 words
A METHOD FOR PRODUCING CEMENT COMPRISING FEEDING A MAJOR PORTION OF CEMENT RAW MATERIAL INTO THE UPPER FEED END OF A ROTARY CEMENT KILN, ROTATING SAID KILN, FEEDING FUEL INTO THE LOWER DISCHARGE END OF THE KILN AND BURNING IT TO COUNTERCURRENTLY HEAT THE CEMENT RAW MATERIAL AS IT PROGRESSIVELY MOVES DOWN THE KILN THROUGH A CALCINING ZONE AND THEN A CLINKERING ZONE AND IS THEREAFTER DISCHARGED AT THE LOWER DISCHARGE END OF THE KILN AS FULLY CLINKERED MATERIAL, INJECTING A MINOR PORTION OF CEMENT RAW MATERIAL AS A STREAM INTO THE KILN TO IMPINGE ON THE GENERAL AREA OF THE CLINKERING ZONE, SENSING ANY CHANGE IN THE LOCATION OF SAID CLINKERING ZONE, AND VARYING THE RATE OF FEED OF SAID MINOR PORTION OF CEMENT RAW MATERIAL AS A FUNCTION OF INCIPIENT CHANGES IN THE LOCATION OF THE CLINKERING ZONE TO MAINTAIN THE POSITION OF THE CLINKERING ZONE AT A SUBSTANTIALLY FIXED PREDETERMINED DISTANCE FROM THE DISCHARGE END OF THE KILN.
Claim 2
Independent Claim 161 words
A METHOD FOR PRODUCING CEMENT COMPRISING FEEDING A MAJOR PORTION OF CEMENT RAW MATERIAL INTO THE UPPER FEED END OF A ROTARY CEMENT KILN, ROTATING SAID KILN, FEEDING FUEL INTO THE LOWER DISCHARGE END OF THE KILN AND BURNING IT TO COUNTERCURRENTLY HEAT THE CEMENT RAW MATERIAL AS IT PROGRESSIVELY MOVES DOWN THE KILN THROUGH A CALCINING ZONE AND THEN A CLINKERING ZONE AND IS THEREAFTER DISCHARGED AT THE LOWER DISCHARGE END OF THE KILN AS FULLY CLINKERED MATERIAL, INJECTING A MINOR PORTION OF CEMENT RAW MATERIAL AS A STREAM INTO THE KILN TO IMPINGE ON THE GENERAL AREA OF THE CLINKERING ZONE, SENSING ANY CHANGE IN THE LOCATION OF SAID CLINKERING ZONE, AND VARYING THE RATE OF FEED OF SAID MINOR PORTION OF CEMENT RAW MATERIAL AS A FUNCTION OF INCIPIENT CHANGES IN THE LOCATION OF THE CLINKERING ZONE TO MAINTAIN THE POSITION OF THE CLINKERING ZONE AT A SUBSTANTIALLY FIXED PREDETERMINED DISTANCE FROM THE DISCHARGE END OF THE KILN.

References Cited (Backward Citations)

US1706749A Cited
US2282584A Cited
US2484911A Cited
US2639269A Cited
US3087715A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-02-06 1970-08-08 1971-02-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-02-06 1974-08-08 1975-02-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-02-06 1978-08-08 1979-02-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag