← Back to Patent Explorer
US3302707A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for improving fluid recoveries from earthen formations

Assignee: Mobil Oil AS
•
Filing: 1964-09-30
•
Granted: 1967-02-07
•
Expires: 1984-09-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Marion L Slusser
  • 👤 Jr Carl Connally

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 15:14
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 170 words
A METHOD FOR THE IN SITU PLACEMENT OF A BARRIER TO FLUID FLOWS IN OPENINGS IN SUBTERRANEAN DEPOSITS, COMPRISING THE STEPS OF: (A) PROVIDING A PLURALITY OF SPACED-APART WELLS IN FLUID COMMUNICATION WITH OPENINGS IN THE DEPOSIT, (B) INTRODUCING INTO OPENINGS IN THE DEPOSIT, VIA ONE OF SAID WELLS, A BARRIER-FORMING FLUID SUFFICIENT IN QUANTITY TO FORM A BARRIER TO FLUID FLOW OF A DESIRED AREAL EXTENT WHEN DISPOSED IN ITS ULTIMATE POSITION AND INTRODUCING INTO OPENINGS IN THE DEPOSIT, VIA ONE OF SAID WELLS, A DRIVING FLUID FOR EXCLUDING THE BARRIERFORMING FLUID FROM COMMUNICATING OPENINGS BETWEEN WELLS, (C) CLOSING OTHER OF SAID WELLS NOT USED FOR INTRODUCING THE DRIVING FLUID TO FLUID FLOWS DURING THE INTRODUCTION OF THE DRIVING FLUID EXCEPT FOR A MONITORING FLOW SUITABLE TO DETECT A FLOW THEREFROM OF SAID DRIVING FLUID, AND (D) OPENING THE OTHER OF SAID WELLS AFTER DETECTION OF SAID DRIVING FLUID TO A FLOW OF SAID DRIVING FLUID SUITABLE TO CIRCULATE THE BARRIER-FORMING FLUID FROM THE COMMUNICATING OPENINGS AND THE WELLS.
Claim 2
Independent Claim 170 words
A METHOD FOR THE IN SITU PLACEMENT OF A BARRIER TO FLUID FLOWS IN OPENINGS IN SUBTERRANEAN DEPOSITS, COMPRISING THE STEPS OF: (A) PROVIDING A PLURALITY OF SPACED-APART WELLS IN FLUID COMMUNICATION WITH OPENINGS IN THE DEPOSIT, (B) INTRODUCING INTO OPENINGS IN THE DEPOSIT, VIA ONE OF SAID WELLS, A BARRIER-FORMING FLUID SUFFICIENT IN QUANTITY TO FORM A BARRIER TO FLUID FLOW OF A DESIRED AREAL EXTENT WHEN DISPOSED IN ITS ULTIMATE POSITION AND INTRODUCING INTO OPENINGS IN THE DEPOSIT, VIA ONE OF SAID WELLS, A DRIVING FLUID FOR EXCLUDING THE BARRIERFORMING FLUID FROM COMMUNICATING OPENINGS BETWEEN WELLS, (C) CLOSING OTHER OF SAID WELLS NOT USED FOR INTRODUCING THE DRIVING FLUID TO FLUID FLOWS DURING THE INTRODUCTION OF THE DRIVING FLUID EXCEPT FOR A MONITORING FLOW SUITABLE TO DETECT A FLOW THEREFROM OF SAID DRIVING FLUID, AND (D) OPENING THE OTHER OF SAID WELLS AFTER DETECTION OF SAID DRIVING FLUID TO A FLOW OF SAID DRIVING FLUID SUITABLE TO CIRCULATE THE BARRIER-FORMING FLUID FROM THE COMMUNICATING OPENINGS AND THE WELLS.

References Cited (Backward Citations)

US1198078A Cited
US1870869A Cited
US2365039A Cited
US2595979A Cited
US2593477A Cited
US2777679A Cited
US2818240A Cited
US2807324A Cited
US2976926A Cited
US2969226A Cited
US3084744A Cited
US3141503A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1970-02-06 1970-08-08 1971-02-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1974-02-06 1974-08-08 1975-02-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1978-02-06 1978-08-08 1979-02-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag