US3297895A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Deflection yoke mounting assembly
Assignee: Motorola Solutions Inc
•
Filing: 1964-01-15
•
Granted: 1967-01-10
•
Expires: 1984-01-15
Abstract
No abstract record available.
Inventors
- 👤 Edward A Salners
- 👤 Thomas R Steele
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 06:38
CPC Classifications
H; H01; H01J; H01J29/00; H01J29/46; H01J29/82; H01J29/823; H01J29/826; H01J29/70; H01J29/72; H01J29/76; H01J29/762
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
159 words
AN ASSEMBLY FOR A CATHODE RAY TUBE HAVING A FUNNEL PORTION JOINED TO A NECK PORTION, INCLUDING IN COMBINATION, A DEFLECTION YOKE FOR THE CATHODE RAY TUBE, A YOKE MOUNTING STRUCTURE INCLUDING FIRST YOKE SUPPORT MEANS COMPRISING FIRST CLAMPING MEANS ADAPTED TO BE POSITIONED ADJACENT THE FUNNEL OF THE TUBE AND CONCENTRIC WITH THE NECK THEREOF, CUSHION MEANS SECURED WITH PRESSURE SENSITIVE ADHESIVE TO AND BETWEEN SAID FIRST YOKE SUPPORT MEANS AND THE FUNNEL PORTION, SAID FIRST CLAMPING MEANS HAVING AN OPENING TO SECURE THE FORWARD PORTION OF SAID YOKE AND TO PROVIDE SLIDING MOVEMENT OF SAID YOKE THEREIN, SAID YOKE MOUNTING STRUCTURE FURTHER INCLUDING SECOND YOKE SUPPORT MEANS COMPRISING SECOND CLAMPING MEANS REARWARDLY OF SAID YOKE AND SECURED TO THE NECK OF THE CATHODE RAY TUBE, SO THAT SAID YOKE MAY BE MOVED IN CONCENTRIC RELATION TO THE NECK OF THE TUBE IN VARIOUS POSITIONS TOWARD AND AWAY FROM THE FUNNEL THEREOF AND THEN CLAMPED IN FIXED POSITION.
Claim 2
Dependent Claim
159 words
AN ASSEMBLY FOR A CATHODE RAY TUBE HAVING A FUNNEL PORTION JOINED TO A NECK PORTION, INCLUDING IN COMBINATION, A DEFLECTION YOKE FOR THE CATHODE RAY TUBE, A YOKE MOUNTING STRUCTURE INCLUDING FIRST YOKE SUPPORT MEANS COMPRISING FIRST CLAMPING MEANS ADAPTED TO BE POSITIONED ADJACENT THE FUNNEL OF THE TUBE AND CONCENTRIC WITH THE NECK THEREOF, CUSHION MEANS SECURED WITH PRESSURE SENSITIVE ADHESIVE TO AND BETWEEN SAID FIRST YOKE SUPPORT MEANS AND THE FUNNEL PORTION, SAID FIRST CLAMPING MEANS HAVING AN OPENING TO SECURE THE FORWARD PORTION OF SAID YOKE AND TO PROVIDE SLIDING MOVEMENT OF SAID YOKE THEREIN, SAID YOKE MOUNTING STRUCTURE FURTHER INCLUDING SECOND YOKE SUPPORT MEANS COMPRISING SECOND CLAMPING MEANS REARWARDLY OF SAID YOKE AND SECURED TO THE NECK OF THE CATHODE RAY TUBE, SO THAT SAID YOKE MAY BE MOVED IN CONCENTRIC RELATION TO THE NECK OF THE TUBE IN VARIOUS POSITIONS TOWARD AND AWAY FROM THE FUNNEL THEREOF AND THEN CLAMPED IN FIXED POSITION.
References Cited (Backward Citations)
US3201629A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-01-09 | 1970-07-11 | 1971-01-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-01-09 | 1974-07-11 | 1975-01-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-01-09 | 1978-07-11 | 1979-01-10 | $7700.00 | Window Closed / Lapsed |