US3297403A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for the preparation of intermetallic compounds
Assignee: Wyeth Holdings LLC
•
Filing: 1964-03-26
•
Granted: 1967-01-10
•
Expires: 1984-03-26
Abstract
No abstract record available.
Inventors
- 👤 Haacke Gottfried Christian
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 19:12
CPC Classifications
C; C22; C22C; C22C1/00; C22C1/007; C01; C01B; C01B19/00; C01B19/007; C01B25/00; C01B25/06; Y; Y10; Y10S; Y10S148/00; Y10S148/063; Y10S148/065; Y10S420/00; Y10S420/903
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
216 words
IN A PROCESS FOR PREPARING A CRYSTALLIZED INTERMETALLIC COMPOUND IN THE VAPOR PHASE AT A TEMPERATURE BELOW ITS DECOMPOSITION TEMPERATURE BY BRINGING INTO CHEMCIAL REACTION STIOCHIOMETRIC AMOUNTS OF (A) A CATIONIC ELEMENT SELECTED FROM THE GROUP CONSISTING OF GROUP II AND GROUP III OF THE PERIODIC TABLE AND (B) AN ANIOMIC ELEMENT SELECTED FROM THE GROUP CONSISTING OF GROUP V AND GROUP VI OF THE PERIODIC TABLE, SAID ELEMENTS BEING PRESENT IN STOICHIOMETRIC AMOUNTS, THE IMPROVEMENT WHICH COMPRISES THE STEPS OF: INCORPORATING INTO AN AMPOULE MAINTAINED SUBSTANTIALLY UNDER VACUUM STOICHIOMETRIC AMOUNTS OF (A) SAID CATIONIC ELEMENT AND (B) SAID ANIONIC ELEMENT; HEATING THE CONTENTS IN SAID AMPOULE TO A TEMPERATURE SUFFICIENTLY HIGH TO BOTH VAPORIZE SAID ANIONIC ELELMENT AND TO MELT, BUT NOT TO VAPORIZE, THE SAID CATIONIC ELEMENT; MAINTAINING SAID INITIAL TEMPERATURE WHEREBY INTERMETALLIC COMPOUND FORMS, SOLIDIFIES AND BLANKETS THE SAID MOLTEN CATIONIC ELEMENT; LOCALLY APPLYING SUFFICIENT HEAT TO A PORTION OF SAID AMPOULE TO INSURE THE VAPORIZATION, BUT NOT THE DECOMPOSITION, OF THE FORMED INTERMETALLIC COMPOUND SURROUNDING SAID MOLTEN CATIONIC ELEMENT; CRYSTALLIZING THE LATTER VAPORIZED INTERMETALLIC COMPOUND FROM THE SURFACE OF THE MOLTEN CATIONIC ELEMENT IN A NON-LOCALLY HEATED PORTION OF SAID AMPOULE; AND CONTINUING TO HEAT THE AMPOULE LOCALLY AT THE LATTER TEMPERATURE UNTIL THE MOLTEN CATIONIC ELEMENT THEREIN HAS BEEN TOTALLY CONSUMED.
Claim 2
Dependent Claim
216 words
IN A PROCESS FOR PREPARING A CRYSTALLIZED INTERMETALLIC COMPOUND IN THE VAPOR PHASE AT A TEMPERATURE BELOW ITS DECOMPOSITION TEMPERATURE BY BRINGING INTO CHEMCIAL REACTION STIOCHIOMETRIC AMOUNTS OF (A) A CATIONIC ELEMENT SELECTED FROM THE GROUP CONSISTING OF GROUP II AND GROUP III OF THE PERIODIC TABLE AND (B) AN ANIOMIC ELEMENT SELECTED FROM THE GROUP CONSISTING OF GROUP V AND GROUP VI OF THE PERIODIC TABLE, SAID ELEMENTS BEING PRESENT IN STOICHIOMETRIC AMOUNTS, THE IMPROVEMENT WHICH COMPRISES THE STEPS OF: INCORPORATING INTO AN AMPOULE MAINTAINED SUBSTANTIALLY UNDER VACUUM STOICHIOMETRIC AMOUNTS OF (A) SAID CATIONIC ELEMENT AND (B) SAID ANIONIC ELEMENT; HEATING THE CONTENTS IN SAID AMPOULE TO A TEMPERATURE SUFFICIENTLY HIGH TO BOTH VAPORIZE SAID ANIONIC ELELMENT AND TO MELT, BUT NOT TO VAPORIZE, THE SAID CATIONIC ELEMENT; MAINTAINING SAID INITIAL TEMPERATURE WHEREBY INTERMETALLIC COMPOUND FORMS, SOLIDIFIES AND BLANKETS THE SAID MOLTEN CATIONIC ELEMENT; LOCALLY APPLYING SUFFICIENT HEAT TO A PORTION OF SAID AMPOULE TO INSURE THE VAPORIZATION, BUT NOT THE DECOMPOSITION, OF THE FORMED INTERMETALLIC COMPOUND SURROUNDING SAID MOLTEN CATIONIC ELEMENT; CRYSTALLIZING THE LATTER VAPORIZED INTERMETALLIC COMPOUND FROM THE SURFACE OF THE MOLTEN CATIONIC ELEMENT IN A NON-LOCALLY HEATED PORTION OF SAID AMPOULE; AND CONTINUING TO HEAT THE AMPOULE LOCALLY AT THE LATTER TEMPERATURE UNTIL THE MOLTEN CATIONIC ELEMENT THEREIN HAS BEEN TOTALLY CONSUMED.
References Cited (Backward Citations)
US2871100A
Cited
US3230044A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1970-01-09 | 1970-07-11 | 1971-01-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1974-01-09 | 1974-07-11 | 1975-01-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1978-01-09 | 1978-07-11 | 1979-01-10 | $7700.00 | Window Closed / Lapsed |