US3289160A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Means for comparing digital values
Assignee: International Business Machines Corp
•
Filing: 1963-12-23
•
Granted: 1966-11-29
•
Expires: 1983-12-23
Abstract
No abstract record available.
Inventors
- 👤 Richard S Carter
- 👤 Walter W Welz
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 14:19
CPC Classifications
G; G06; G06F; G06F11/00; G06F11/07; G06F11/08; G06F7/00; G06F7/02
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
135 words
IN A DATA PROCESSING SYSTEM, A COMPARING MEANS COMPRISING: A VALIDITY CHECKING CIRCUIT; A DATA BUS, SAID DATA BUS BEING CONNECTED TO SAID BUS VALIDITY CHECKING CIRCUIT, SAID BUS VALIDITY CHECKING CIRCUIT BEING OPERATIVE TO GENERATE AN ERROR SIGNAL OR A NO-ERROR SIGNAL IN DEPENDENCE UPON THE VALIDITY OF SAID DATA ON SAID BUS; FIRST AND SECOND DATA SOURCES, EACH OF SAID DATA SOURCES CONTAINING DATA WHICH DATA IS TO BE COMARED; FIRST AND SECOND GATES, ONE FOR EACH OF SAID SOURCES, EACH OF SAID GATES BEING SELECTIVELY OPERABLE TO CONNECT THE CORRESPONDING SOURCE TO SAID BUS; AND FIRST AND SECOND GATE CONTROL MEANS, ONE DOR EACH OF SAID GATES, EACH OPERATIVE TO CAUSE THE CORRESPONDING GATE TO CONNECT THE RELATED SOURCE TO SAID BUS, SAID FIRST AND SECOND GATE CONTROL MEANS BEING SIMULTANEOUSLY OPERBLE;
Claim 2
Dependent Claim
135 words
IN A DATA PROCESSING SYSTEM, A COMPARING MEANS COMPRISING: A VALIDITY CHECKING CIRCUIT; A DATA BUS, SAID DATA BUS BEING CONNECTED TO SAID BUS VALIDITY CHECKING CIRCUIT, SAID BUS VALIDITY CHECKING CIRCUIT BEING OPERATIVE TO GENERATE AN ERROR SIGNAL OR A NO-ERROR SIGNAL IN DEPENDENCE UPON THE VALIDITY OF SAID DATA ON SAID BUS; FIRST AND SECOND DATA SOURCES, EACH OF SAID DATA SOURCES CONTAINING DATA WHICH DATA IS TO BE COMARED; FIRST AND SECOND GATES, ONE FOR EACH OF SAID SOURCES, EACH OF SAID GATES BEING SELECTIVELY OPERABLE TO CONNECT THE CORRESPONDING SOURCE TO SAID BUS; AND FIRST AND SECOND GATE CONTROL MEANS, ONE DOR EACH OF SAID GATES, EACH OPERATIVE TO CAUSE THE CORRESPONDING GATE TO CONNECT THE RELATED SOURCE TO SAID BUS, SAID FIRST AND SECOND GATE CONTROL MEANS BEING SIMULTANEOUSLY OPERBLE;
References Cited (Backward Citations)
US3085230A
Cited
US3204221A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-11-28 | 1970-05-30 | 1970-11-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-11-28 | 1974-05-30 | 1974-11-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-11-28 | 1978-05-30 | 1978-11-29 | $7700.00 | Window Closed / Lapsed |