Method of building in situ construction using sequential molding techniques
Assignee: Individual
•
Filing: 1963-08-07
•
Granted: 1966-09-27
•
Expires: 1983-08-07
Abstract
No abstract record available.
Inventors
- 👤 Brian H Dudson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 07:39
CPC Classifications
E; E04; E04B; E04B1/00; E04B1/35; E04B1/3516
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
267 words
A METHOD OF MAKING A CONCRETE BUILDING, WHICH COMPRISES SETTING UP AT THE BUILDING SITE A CONSTRUCTION PLATFORM COMPRISING VERTICAL FORMS FOR SIDE WALLS OF THE BUILDING AND HORIZONTAL FORMS FOR FLOORS, BUILDING SIDE WALLS OF CONCRETE CONTAINED WITHIN THE VERTICAL FORMS, LEAVING OPENINGS AT SPACED INTERVALS EXTENDING THROUGH THE WALLS AS THEY ARE FORMED, PLACING SUPPORT PLATFORMS THROUGH THESE OPENINGS IN THE WALLS, SUPPORTING THE CONSTRUCTION PLATFORM AND RAISING IT AFTER THE CONCRETE HAS CURED FROM BENEATH THE PLATFORM BY JACKING MEANS RESTING ON AND APPLYING LOAD TO SAID PLATFORMS, POURING THE SIDE WALLS CONTINUOUSLY UNTIL THE DESIRED TOP IS REACHED, THEN POURING A FLOOR USING THE HORIZONTAL FORMS, LOWERING SAID CONSTRUCTION PLAFORM AFTER THE CONCRETE CURES AND SUPPORTING IT WITH THE SAME JACKING MEANS BY AGAIN APPLYING LOAD TO THE SUPPORT PLATFORMS TO THE LEVEL OF THE NEXT SUCCEEDING FLOOR DESIRED, POURING SAID FLOOR AND SUCCESSIVE ONES DOWNWARDLY BY LOWERING THE PLATFORM EACH TIME, UNTIL THELOWERMOST FLOOR IS REACHED, WHEREIN THE LIFTING AND LOWERING OF THE CONSTRUCTION PLATFORM IS ACCOMPLISHED BY A SERIES OF JACKING MEANS, WHICH COMPRISES SUPPORTING THE BUILDING PLATFORM BY A FIRST JACKING MEANS APPLYING LOAD TO A SUPPORT PLATFORM, MOVING SAID BUILDING PLATFORM WITH THE JACKING MEANS TO A DESIRED LEVEL, SUBSEQUENTLY SHIFTING SUPPORT OF THE BUILDING PLATFORM TO A SECOND JACKING MEANS APPLYING LOAD TO ANOTHER SUPPORT PLATFORM FOR SUPPORT AND MOVEMENT OF THE BUILDING PLATFORM TO THE NEXT DESIRED LEVEL, AND REPOSITIONING SAID FIRST JACKING MEANS ON YET ANOTHER SUPPORT PLATFORM FOR ACCEPTANCE OF SUCCESSIVE SUPPORT AND MOVEMENT OF THE BUILDING PLATFORM AFTER MOVEMENT BY THE SECOND JACKING MEANS.
Claim 2
Independent Claim
267 words
A METHOD OF MAKING A CONCRETE BUILDING, WHICH COMPRISES SETTING UP AT THE BUILDING SITE A CONSTRUCTION PLATFORM COMPRISING VERTICAL FORMS FOR SIDE WALLS OF THE BUILDING AND HORIZONTAL FORMS FOR FLOORS, BUILDING SIDE WALLS OF CONCRETE CONTAINED WITHIN THE VERTICAL FORMS, LEAVING OPENINGS AT SPACED INTERVALS EXTENDING THROUGH THE WALLS AS THEY ARE FORMED, PLACING SUPPORT PLATFORMS THROUGH THESE OPENINGS IN THE WALLS, SUPPORTING THE CONSTRUCTION PLATFORM AND RAISING IT AFTER THE CONCRETE HAS CURED FROM BENEATH THE PLATFORM BY JACKING MEANS RESTING ON AND APPLYING LOAD TO SAID PLATFORMS, POURING THE SIDE WALLS CONTINUOUSLY UNTIL THE DESIRED TOP IS REACHED, THEN POURING A FLOOR USING THE HORIZONTAL FORMS, LOWERING SAID CONSTRUCTION PLAFORM AFTER THE CONCRETE CURES AND SUPPORTING IT WITH THE SAME JACKING MEANS BY AGAIN APPLYING LOAD TO THE SUPPORT PLATFORMS TO THE LEVEL OF THE NEXT SUCCEEDING FLOOR DESIRED, POURING SAID FLOOR AND SUCCESSIVE ONES DOWNWARDLY BY LOWERING THE PLATFORM EACH TIME, UNTIL THELOWERMOST FLOOR IS REACHED, WHEREIN THE LIFTING AND LOWERING OF THE CONSTRUCTION PLATFORM IS ACCOMPLISHED BY A SERIES OF JACKING MEANS, WHICH COMPRISES SUPPORTING THE BUILDING PLATFORM BY A FIRST JACKING MEANS APPLYING LOAD TO A SUPPORT PLATFORM, MOVING SAID BUILDING PLATFORM WITH THE JACKING MEANS TO A DESIRED LEVEL, SUBSEQUENTLY SHIFTING SUPPORT OF THE BUILDING PLATFORM TO A SECOND JACKING MEANS APPLYING LOAD TO ANOTHER SUPPORT PLATFORM FOR SUPPORT AND MOVEMENT OF THE BUILDING PLATFORM TO THE NEXT DESIRED LEVEL, AND REPOSITIONING SAID FIRST JACKING MEANS ON YET ANOTHER SUPPORT PLATFORM FOR ACCEPTANCE OF SUCCESSIVE SUPPORT AND MOVEMENT OF THE BUILDING PLATFORM AFTER MOVEMENT BY THE SECOND JACKING MEANS.
References Cited (Backward Citations)
US789988A
Cited
US1096792A
Cited
US1617746A
Cited
US1701113A
Cited
US1791646A
Cited
US1862544A
Cited
US1891160A
Cited
US2275738A
Cited
US2414310A
Cited
AT167316B
Cited
US2620543A
Cited
US2705359A
Cited
FR1336119A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-09-26 | 1970-03-28 | 1970-09-27 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-09-26 | 1974-03-28 | 1974-09-27 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-09-26 | 1978-03-28 | 1978-09-27 | $7700.00 | Window Closed / Lapsed |