US3249506A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Integral vapor generating and superheating neutronic reactor system
Assignee: Westinghouse Electric Corp
•
Filing: 1961-04-28
•
Granted: 1966-05-03
•
Expires: 1981-04-28
Abstract
No abstract record available.
Inventors
- 👤 Stephen N Tower
- 👤 Jr William H Arnold
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 20:36
CPC Classifications
G; G21; G21C; G21C1/00; G21C1/32; G21C1/04; G21C1/06; G21C1/14; G21C1/16; G21C1/18; G21C1/20; G21C13/00; G21C13/02; G21C13/04; G21C5/00; G21C5/18; G21C5/22; G21D; G21D5/00; G21D5/04; G21D5/08; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
225 words
IN A DIRECT CYCLE NEUTRONIC REACTOR SYSTEM, THE COMBINATION COMPRISING AN UPSTANDING GENERALLY TUBULAR VESSEL, A NUCLEAR CORE STRUCTURE SUPPORTED WITHIN SAID VESSEL, MEANS FOR HEATING A LIQUID WITHIN A FIRST PORTION OF SAID CORE TO PRODUCE A VAPOR-LIQUID MIXTURE, MEANS COUPLED TO SAID FIRST CORE PORTION FOR SEPARATING VAPOR FROM SAID VAPOR-LIQUID MIXTURE, MEANS COUPLED TO SAID SEPARATING MEANS FOR SUPERHEATING SAID SEPARATED VAPOR WITHIN A SECOND PORTION OF SAID CORE, A FIRST EXTERNAL VAPOR UTILIZING MEANS FOR USING SAID SUPERHEATED VAPOR, A SUPERHEAT CONDUIT MEANS COUPLING SAID SUPERHEATING MEANS WITH SAID FIRST EXTERNAL VAPOR UTILIZING MEANS, MEANS COUPLING SAID UTILIZED SUPERHEATED VAPOR TO A THIRD PORTION OF SAID CORE FOR REHEATING SAID VAPOR, A FIRST CONDUIT MEANS DISPOSED IN BYPASSING RELATIONSHIP WITH SAID FIRST EXTERNAL VAPOR UTILIZING MEANS FOR COUPLING THE OUTLET OF SAID SECOND CORE PORTION TO THE INLET OF SAID THIRD CORE PORTION, MEANS COUPLED TO SAID FIRST CONDUIT MEANS FOR REMOVING HEAT FROM VAPOR FLOWING THERETHROUGH, A SECOND EXTERNAL VAPOR UTILIZING MEANS COUPLED TO SAID THIRD CORE PORTION, A CONDENSING MEANS COUPLED TO SAID SECOND EXTERNAL VAPOR UTILIZING MEANS, A SECOND CONDUIT MEANS DISPOSED IN A BYPASSING RELATIONSHIP WITH SAID SECOND VAPOR UTILIZING MEANS COUPLING SAID THIRD CORE PORTION TO SAID CONDENSING MEANS, AND MEANS COUPLED TO SAID LAST-MENTIONED CONDUIT MEANS FOR REDUCING THE PRESSURE OF THE VAPOR FLOWING THERETHROUGH.
Claim 2
Dependent Claim
225 words
IN A DIRECT CYCLE NEUTRONIC REACTOR SYSTEM, THE COMBINATION COMPRISING AN UPSTANDING GENERALLY TUBULAR VESSEL, A NUCLEAR CORE STRUCTURE SUPPORTED WITHIN SAID VESSEL, MEANS FOR HEATING A LIQUID WITHIN A FIRST PORTION OF SAID CORE TO PRODUCE A VAPOR-LIQUID MIXTURE, MEANS COUPLED TO SAID FIRST CORE PORTION FOR SEPARATING VAPOR FROM SAID VAPOR-LIQUID MIXTURE, MEANS COUPLED TO SAID SEPARATING MEANS FOR SUPERHEATING SAID SEPARATED VAPOR WITHIN A SECOND PORTION OF SAID CORE, A FIRST EXTERNAL VAPOR UTILIZING MEANS FOR USING SAID SUPERHEATED VAPOR, A SUPERHEAT CONDUIT MEANS COUPLING SAID SUPERHEATING MEANS WITH SAID FIRST EXTERNAL VAPOR UTILIZING MEANS, MEANS COUPLING SAID UTILIZED SUPERHEATED VAPOR TO A THIRD PORTION OF SAID CORE FOR REHEATING SAID VAPOR, A FIRST CONDUIT MEANS DISPOSED IN BYPASSING RELATIONSHIP WITH SAID FIRST EXTERNAL VAPOR UTILIZING MEANS FOR COUPLING THE OUTLET OF SAID SECOND CORE PORTION TO THE INLET OF SAID THIRD CORE PORTION, MEANS COUPLED TO SAID FIRST CONDUIT MEANS FOR REMOVING HEAT FROM VAPOR FLOWING THERETHROUGH, A SECOND EXTERNAL VAPOR UTILIZING MEANS COUPLED TO SAID THIRD CORE PORTION, A CONDENSING MEANS COUPLED TO SAID SECOND EXTERNAL VAPOR UTILIZING MEANS, A SECOND CONDUIT MEANS DISPOSED IN A BYPASSING RELATIONSHIP WITH SAID SECOND VAPOR UTILIZING MEANS COUPLING SAID THIRD CORE PORTION TO SAID CONDENSING MEANS, AND MEANS COUPLED TO SAID LAST-MENTIONED CONDUIT MEANS FOR REDUCING THE PRESSURE OF THE VAPOR FLOWING THERETHROUGH.
References Cited (Backward Citations)
US2787593A
Cited
US2832733A
Cited
US2806820A
Cited
GB799725A
Cited
FR1141064A
Cited
US2917444A
Cited
US2857324A
Cited
US2957815A
Cited
BE563693A
Cited
US2975118A
Cited
US3047479A
Cited
GB844408A
Cited
FR1184886A
Cited
GB851820A
Cited
US2999059A
Cited
US3108938A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-05-02 | 1969-11-01 | 1970-05-03 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-05-02 | 1973-11-01 | 1974-05-03 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-05-02 | 1977-11-01 | 1978-05-03 | $7700.00 | Window Closed / Lapsed |