US3246696A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of freeing pipe stuck in a well
Assignee: Pan American Petroleum Corp
•
Filing: 1963-10-25
•
Granted: 1966-04-19
•
Expires: 1983-10-25
Abstract
No abstract record available.
Inventors
- 👤 Jr James E Fox
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 23:45
CPC Classifications
E; E21; E21B; E21B31/00; E21B31/03; E21B31/035
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
156 words
IN A WELL OPERATION WHEREIN A PIPE STRING IS PLACED IN A BOREHOLE FORMED IN THE EARTH TRAVERSING A PERMEABLE FORMATION AND A CIRCULATING FLUID CONTAINING SUSPENDED FINELY DIVIDED SOLIDS IS CIRCULATED IN SAID BOREHOLE UNTIL A FILTER CAKE HAS BEEN DEPOSITED ON THE WALL OF SAID BOREHOLE TO CONTACT SAID PIPE STRING AND CAUSE SAID PIPE STRING TO BECOME DIFFERENTIALLY STUCK THEREAGAINST, THE IMPROVED METHOD OF FREEING SAID STUCK PIPE STRING WHICH COMPRISES: INJECTING A GASEOUS FLUID INTO A CIRCULATING LIQUID, CIRCULATING THE RESULTING GASIFIED LIQUID IN SAID BOREHOLE TO EFFECTIVELY REDUCE THE DIFFERENTIAL PRESSURE BETWEEN THE FLUID THEREIN AND SAID PERMEABLE FORMATION, WORKING SAID PIPE STRING IN SAID BOREHOLE WHILE CIRCULATING SAID GASIFIED LIQUID TO EFFECTIVELY FREE SAID STUCK PIPE STRING, AND MAINTAINING THE INTERIOR OF SAID DRILL PIPE STRING IN UNOBSTRUCTED FLUID COMMUNICATION WITH THE ANNULUS BETWEEN SAID PIPE STRING AND THE BOREHOLE WALL WHILE CIRCULATING GASIFIED LIQUID AND WORKING SAID PIPE STRING.
Claim 2
Dependent Claim
156 words
IN A WELL OPERATION WHEREIN A PIPE STRING IS PLACED IN A BOREHOLE FORMED IN THE EARTH TRAVERSING A PERMEABLE FORMATION AND A CIRCULATING FLUID CONTAINING SUSPENDED FINELY DIVIDED SOLIDS IS CIRCULATED IN SAID BOREHOLE UNTIL A FILTER CAKE HAS BEEN DEPOSITED ON THE WALL OF SAID BOREHOLE TO CONTACT SAID PIPE STRING AND CAUSE SAID PIPE STRING TO BECOME DIFFERENTIALLY STUCK THEREAGAINST, THE IMPROVED METHOD OF FREEING SAID STUCK PIPE STRING WHICH COMPRISES: INJECTING A GASEOUS FLUID INTO A CIRCULATING LIQUID, CIRCULATING THE RESULTING GASIFIED LIQUID IN SAID BOREHOLE TO EFFECTIVELY REDUCE THE DIFFERENTIAL PRESSURE BETWEEN THE FLUID THEREIN AND SAID PERMEABLE FORMATION, WORKING SAID PIPE STRING IN SAID BOREHOLE WHILE CIRCULATING SAID GASIFIED LIQUID TO EFFECTIVELY FREE SAID STUCK PIPE STRING, AND MAINTAINING THE INTERIOR OF SAID DRILL PIPE STRING IN UNOBSTRUCTED FLUID COMMUNICATION WITH THE ANNULUS BETWEEN SAID PIPE STRING AND THE BOREHOLE WALL WHILE CIRCULATING GASIFIED LIQUID AND WORKING SAID PIPE STRING.
References Cited (Backward Citations)
US3126970A
Cited
US2372575A
Cited
US2361558A
Cited
US2726063A
Cited
US2818230A
Cited
US2865454A
Cited
US2956626A
Cited
US2951681A
Cited
US2984309A
Cited
US3095052A
Cited
US3104707A
Cited
US3099624A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-04-18 | 1969-10-18 | 1970-04-19 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-04-18 | 1973-10-18 | 1974-04-19 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-04-18 | 1977-10-18 | 1978-04-19 | $7700.00 | Window Closed / Lapsed |