← Back to Patent Explorer
US3245294A Expired / Lapsed US ⏱️ 0.0 years remaining

Means for and method of cutting thermoplastic materials

Assignee: GM Pfaff AG
•
Filing: 1964-10-20
•
Granted: 1966-04-12
•
Expires: 1984-10-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Butter Otto
  • 👤 Siewerth Gerhard
  • 👤 Frohlich Helmut
  • 👤 Hafner Klaus
  • 👤 Damaschek Ernst

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 10:43
CPC Classifications
B; B26; B26F; B26F3/00; B26F3/06; Y; Y10; Y10T; Y10T83/00; Y10T83/04; Y10T83/0405; Y10T83/041; Y10T83/0414; Y10T83/242; Y10T83/283; Y10T83/293

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 147 words
A DEVICE FOR CUTTING THEREMOPLASTIC WORKPIECES COMPRISING IN COMBINATION: (1) A THERMAL CUTTER OF HIGH ELECTRICAL RESISTIVITY, (2) CURRENT SUPPLY MEANS ENERGIZING SAID CUTTER, TO RAISE THE SAME TO AN OPERATING TEMPERATURE WITHIN THE SOFTENING RANGE OF THE THERMOPLASTIC MATERIAL TO BE CUT, (3) CURRENT CONTROL MEANS EFFECTIVE UPON ACTUATION TO RAISE SAID OPERATING TEMPERATURE TO A POINT IN EXCESS OF THE DECOMPOSITION TEMPERATURE OF SAID MATERIAL, (4) FIRST TIME-DELAY CONTROL MEANS RESPONSIVE TO THE ACTUATION OF SIAD CURRENT CONTROL MEANS AND EFFECTIVE, AFTER LAPSE OF A PREDETERMINED TIME INTERVAL, TO DISCONNECT SAID CURRENT SUPPLY MEANS FROM AND TO ALLOW OF COOLING OF SAID CUTTER, AND (5) SECOND TIME-DELAY CONTROL MEANS ALSO RESPONSIVE TO THE ACTUATION OF SAID CONTROL MEANS AND HAVING A GREATER DELAY TIME THAN SAID FIRST TIME-DELAY MEANS, TO RELEASE SAID CURRENT CONTROL MEANS, AND TO RECONNECT SAID CURRENT SUPPLY MEANS TO SAID CUTTER.
Claim 2
Independent Claim 147 words
A DEVICE FOR CUTTING THEREMOPLASTIC WORKPIECES COMPRISING IN COMBINATION: (1) A THERMAL CUTTER OF HIGH ELECTRICAL RESISTIVITY, (2) CURRENT SUPPLY MEANS ENERGIZING SAID CUTTER, TO RAISE THE SAME TO AN OPERATING TEMPERATURE WITHIN THE SOFTENING RANGE OF THE THERMOPLASTIC MATERIAL TO BE CUT, (3) CURRENT CONTROL MEANS EFFECTIVE UPON ACTUATION TO RAISE SAID OPERATING TEMPERATURE TO A POINT IN EXCESS OF THE DECOMPOSITION TEMPERATURE OF SAID MATERIAL, (4) FIRST TIME-DELAY CONTROL MEANS RESPONSIVE TO THE ACTUATION OF SIAD CURRENT CONTROL MEANS AND EFFECTIVE, AFTER LAPSE OF A PREDETERMINED TIME INTERVAL, TO DISCONNECT SAID CURRENT SUPPLY MEANS FROM AND TO ALLOW OF COOLING OF SAID CUTTER, AND (5) SECOND TIME-DELAY CONTROL MEANS ALSO RESPONSIVE TO THE ACTUATION OF SAID CONTROL MEANS AND HAVING A GREATER DELAY TIME THAN SAID FIRST TIME-DELAY MEANS, TO RELEASE SAID CURRENT CONTROL MEANS, AND TO RECONNECT SAID CURRENT SUPPLY MEANS TO SAID CUTTER.

References Cited (Backward Citations)

US1810987A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-04-11 1969-10-11 1970-04-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-04-11 1973-10-11 1974-04-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-04-11 1977-10-11 1978-04-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag