Abstract

No abstract record available.

Inventors

  • 👤 Campbell George Reid

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 14:59
CPC Classifications
C; C01; C01C; C01C1/00; C01C1/18; C06; C06B; C06B47/00; C06B47/14; F; F02; F02B; F02B3/00; F02B3/06

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 102 words
A PROCESS FOR THE PRODUCTION OF AN EXPLOSIVE COMPOSITION WHICH COMPRISES: (A) MIXING SUBSTANTIALLY DRY AMMONIUM NITRATE GRAINS WITH AN AQUEOUS AMMONIUM NITRATE SOLUTION IN PROPORTIONS SUCH THAT THE WATER CONTENT OF THE MIXTURE IS NOT MORE THAN 10% BY WEIGHT, AT A TEMPERATURE BELOW THE FUSION TEMPERATURE OF THE MIXTURE AND FOR A TIME SUFFICIENT TO DISSOLVE A SURFACE PORTION OF THE GRAINS, (B) THEREAFTER DRYING THE RESULTING MIXTURE WITH A HOT DRYING MEDIUM UNDER CONDITIONS WHICH PRECLUDE COMPLETE DISSOLUTION OF THE GRAINS, AND (C) THEREAFTER IMPREGNATING THE DRIED MIXTURE WITH FROM ABOUT 5 TO 10% BY WEIGHT OF FUEL OIL.
Claim 2
Dependent Claim 102 words
A PROCESS FOR THE PRODUCTION OF AN EXPLOSIVE COMPOSITION WHICH COMPRISES: (A) MIXING SUBSTANTIALLY DRY AMMONIUM NITRATE GRAINS WITH AN AQUEOUS AMMONIUM NITRATE SOLUTION IN PROPORTIONS SUCH THAT THE WATER CONTENT OF THE MIXTURE IS NOT MORE THAN 10% BY WEIGHT, AT A TEMPERATURE BELOW THE FUSION TEMPERATURE OF THE MIXTURE AND FOR A TIME SUFFICIENT TO DISSOLVE A SURFACE PORTION OF THE GRAINS, (B) THEREAFTER DRYING THE RESULTING MIXTURE WITH A HOT DRYING MEDIUM UNDER CONDITIONS WHICH PRECLUDE COMPLETE DISSOLUTION OF THE GRAINS, AND (C) THEREAFTER IMPREGNATING THE DRIED MIXTURE WITH FROM ABOUT 5 TO 10% BY WEIGHT OF FUEL OIL.

References Cited (Backward Citations)

US3103457A Cited
US2125161A Cited
US2590054A Cited
US3009801A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-04-04 1969-10-04 1970-04-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-04-04 1973-10-04 1974-04-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-04-04 1977-10-04 1978-04-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag