← Back to Patent Explorer
US3241365A Expired / Lapsed US ⏱️ 0.0 years remaining

Flow gauge

Assignee: Schroeder Brothers Corp
•
Filing: 1963-03-12
•
Granted: 1966-03-22
•
Expires: 1983-03-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 William E Schroeder
  • 👤 Herman F Holl

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 23:03
CPC Classifications
G; G01; G01F; G01F25/00; G01F25/10

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 177 words
A FLOW GAUGE COMPRISING, (A) A FIRST PASSAGEWAY FOR THE FLOW OF FLUID TO BE MEASURED, (B) AN ORIFICE OF PREDETERMINED DIAMETER IN SAID PASSAGEWAY, (C) A PRESSURE GAUGE FOR INDICATING DIFFERENCES IN PRESSURE IN SAID PASSAGEWAY BETWEEN THE UPSTREAM AND DOWNSTREAM SIDES OF SAID ORIFICE, (D) A SECOND PASSAGEWAY HAVING A SMALL FLUID CAPACITY RELATIVE TO SAID FIRST PASSAGEWAY AND CONNECTING SAID GAUGE TO SAID FIRST PASSAGEWAY UPSTREAM OF SAID ORIFICE, (E) A THIRD PASSAGEWAY HAVING A SMALL FLUID CAPACITY RELATIVE TO SAID FIRST PASSAGEWAY AND CONNECTING SAID GAUGE TO SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE, AND (F) A FOURTH PASSAGEWAY CONNECTING A PORTION OF SAID SECOND PASSAGEWAY IN ADVANCE OF SAID GAUGE AND A PORTION OF SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE, SAID FOURTH PASSAGEWAY HAVING (1) A LARGE FLUID CAPACITY RELARIVE TO SAID SECOND PASSAGEWAY, AND (2) A PRESSURE RELIEF VALVE OPENING TO SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE UPON A PREDETERMINED DIFFERENCE BETWEEN THE PRESSURE IN SAID SECOND PASSAGEWAY AND THE PRESSURE IN SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE.
Claim 2
Dependent Claim 177 words
A FLOW GAUGE COMPRISING, (A) A FIRST PASSAGEWAY FOR THE FLOW OF FLUID TO BE MEASURED, (B) AN ORIFICE OF PREDETERMINED DIAMETER IN SAID PASSAGEWAY, (C) A PRESSURE GAUGE FOR INDICATING DIFFERENCES IN PRESSURE IN SAID PASSAGEWAY BETWEEN THE UPSTREAM AND DOWNSTREAM SIDES OF SAID ORIFICE, (D) A SECOND PASSAGEWAY HAVING A SMALL FLUID CAPACITY RELATIVE TO SAID FIRST PASSAGEWAY AND CONNECTING SAID GAUGE TO SAID FIRST PASSAGEWAY UPSTREAM OF SAID ORIFICE, (E) A THIRD PASSAGEWAY HAVING A SMALL FLUID CAPACITY RELATIVE TO SAID FIRST PASSAGEWAY AND CONNECTING SAID GAUGE TO SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE, AND (F) A FOURTH PASSAGEWAY CONNECTING A PORTION OF SAID SECOND PASSAGEWAY IN ADVANCE OF SAID GAUGE AND A PORTION OF SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE, SAID FOURTH PASSAGEWAY HAVING (1) A LARGE FLUID CAPACITY RELARIVE TO SAID SECOND PASSAGEWAY, AND (2) A PRESSURE RELIEF VALVE OPENING TO SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE UPON A PREDETERMINED DIFFERENCE BETWEEN THE PRESSURE IN SAID SECOND PASSAGEWAY AND THE PRESSURE IN SAID FIRST PASSAGEWAY DOWNSTREAM OF SAID ORIFICE.

References Cited (Backward Citations)

US1340198A Cited
US1559156A Cited
US1700449A Cited
US1729178A Cited
US1941613A Cited
US2071191A Cited
US2718241A Cited
US3095745A Cited
US3037384A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-03-21 1969-09-20 1970-03-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-03-21 1973-09-20 1974-03-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-03-21 1977-09-20 1978-03-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag