← Back to Patent Explorer
US3238729A Expired / Lapsed US ⏱️ 0.0 years remaining

Steam turbine power plants

Assignee: Associated Electrical Industries Ltd
•
Filing: 1963-07-15
•
Granted: 1966-03-08
•
Expires: 1983-07-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Frankel Adolf
  • 👤 Brazier Peter Harding

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 20:47
CPC Classifications
F; F01; F01K; F01K7/00; F01K7/34; F01K7/40; F01K7/42; F22; F22D; F22D1/00; F22D1/32

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 163 words
A STEM TURBINE POWER PLATE INCLUDING: (A) A STEAM TURBINE; (B) FEED WATER HEATING MEANS ARRANGED TO HEAT FEED WATER PASSING TO A STEAM GENERATING UNIT SUPPLYING THE STEAM TURBINE; (C) A FIRST CONDENSING SECTION OF THE FEED WATER HEATING MEANS ARRANGED TO HEAT THE FEED WATER: (D) A SECOND CONDENSING SECTION OF THE FEED WATER HEATING MEANS ARRANGED FURTHER TO HEAT WATER DISCHARGED FROM THE FIRST SECTION; (E) A BLEED POINT ON THE STEAM TO THE FIRST AND (F) FIRST AND SECOND BLEED CONDUITS CONNECTED TO SAID BLEED POINT TO FURNISH BLEED STEAM TO THE FIRST AND SECOND CONDENSING SECTIONS RESPECTIVELY, MEANS FOR PROPORTIONING THE PRESSURE IN SAID FIRST AND SECOND BLEED CONDUIT SO THAT THE PRESSURE OF THE STEAM ENTERING THE SECOND CONDENSING SECTION IS GREATER THAN THE ENTERING THE FIRST CONDENSING SECTION IS GREATER BY THE SATURATION TEMPERATURE OF THE STEAM IN THE SECOND CONDENSING SECTION IS GREATER THAN THE SATURATION TEMPERATURE OF THE STEAM IN THE FIRST CONDENSING SECTION.
Claim 2
Dependent Claim 163 words
A STEM TURBINE POWER PLATE INCLUDING: (A) A STEAM TURBINE; (B) FEED WATER HEATING MEANS ARRANGED TO HEAT FEED WATER PASSING TO A STEAM GENERATING UNIT SUPPLYING THE STEAM TURBINE; (C) A FIRST CONDENSING SECTION OF THE FEED WATER HEATING MEANS ARRANGED TO HEAT THE FEED WATER: (D) A SECOND CONDENSING SECTION OF THE FEED WATER HEATING MEANS ARRANGED FURTHER TO HEAT WATER DISCHARGED FROM THE FIRST SECTION; (E) A BLEED POINT ON THE STEAM TO THE FIRST AND (F) FIRST AND SECOND BLEED CONDUITS CONNECTED TO SAID BLEED POINT TO FURNISH BLEED STEAM TO THE FIRST AND SECOND CONDENSING SECTIONS RESPECTIVELY, MEANS FOR PROPORTIONING THE PRESSURE IN SAID FIRST AND SECOND BLEED CONDUIT SO THAT THE PRESSURE OF THE STEAM ENTERING THE SECOND CONDENSING SECTION IS GREATER THAN THE ENTERING THE FIRST CONDENSING SECTION IS GREATER BY THE SATURATION TEMPERATURE OF THE STEAM IN THE SECOND CONDENSING SECTION IS GREATER THAN THE SATURATION TEMPERATURE OF THE STEAM IN THE FIRST CONDENSING SECTION.

References Cited (Backward Citations)

US1781368A Cited
US1846047A Cited
US1750035A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-03-07 1969-09-06 1970-03-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-03-07 1973-09-06 1974-03-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-03-07 1977-09-06 1978-03-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag