← Back to Patent Explorer
US3237690A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for forming an impermeable barrier in subsurface formations

Assignee: Gulf Research and Development Co
•
Filing: 1962-10-01
•
Granted: 1966-03-01
•
Expires: 1982-10-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jacy C Karp
  • 👤 Marusov Nicholas

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 10:17
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/138; B; B62; B62D; B62D63/00; B62D63/06; B62D63/08

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 97 words
A METHOD OF CREATING A BARRIER FOR REDUCING THE FLOW OF FLUID OTHER THAN OIL INTO A WELL PENETRATING A FORMATION HAVING AN OIL ZONE ADJACENT A ZONE OF FLUID OTHER THAN OIL COMPRISING FORMING A SUBSTANTIALLY HORIZONTAL FRACTURE EXTENDING INTO THE OIL ZONE FROM THE WELL, DISPLACING THROUGH THE FACES OF THE FRACTURE A MATERIAL INSOLUBLE IN OIL AND IN WATER TO REDUCE THE PERMEABILITY OF THE FORMATION ADJACENT THE FRACTURE, THEREAFTER DISPLACING A SLURRY OF PORTLAND CEMENT INTO THE FRACTURE, AND HOLDING THE SLURRY OF PORTLAND CEMENT IN THE FRACTURE UNTIL THE PORTLAND CEMENTS SETS.
Claim 2
Independent Claim 97 words
A METHOD OF CREATING A BARRIER FOR REDUCING THE FLOW OF FLUID OTHER THAN OIL INTO A WELL PENETRATING A FORMATION HAVING AN OIL ZONE ADJACENT A ZONE OF FLUID OTHER THAN OIL COMPRISING FORMING A SUBSTANTIALLY HORIZONTAL FRACTURE EXTENDING INTO THE OIL ZONE FROM THE WELL, DISPLACING THROUGH THE FACES OF THE FRACTURE A MATERIAL INSOLUBLE IN OIL AND IN WATER TO REDUCE THE PERMEABILITY OF THE FORMATION ADJACENT THE FRACTURE, THEREAFTER DISPLACING A SLURRY OF PORTLAND CEMENT INTO THE FRACTURE, AND HOLDING THE SLURRY OF PORTLAND CEMENT IN THE FRACTURE UNTIL THE PORTLAND CEMENTS SETS.
Claim 3
Dependent Claim 85 words
A THREE-LAYER BARRIER TO THE FLOW OF FLUID OTHER THAN OIL INTO AN OIL WELL FROM A ZONE ADJACENT TO THE OIL ZONE WHICH COMPRISES A LAYER OF SUBSTANTIALLY FULLY CURED NEAT PORTLAND CEMENT OCCUPYING AN ARTIFICIALLY PRODUCED FRACTURE EXTENDING INTO SAID OIL ZONE ADJACENT TO THE ZONE CONTAINING SAID OTHER FLUID, AND A SUBSTANTIALLY IMPERMEABLE LAYER ADJACENT EACH SURFACE OF THE PORTLAND CEMENT LAYER CONSISTING OF THE FORMATION ADJACENT SAID FRACTURE HAVING ITS PORES PLUGGED WITH A MATERIAL INSOLUBLE IN OIL AND IN WATER.
Claim 4
Dependent Claim 85 words
A THREE-LAYER BARRIER TO THE FLOW OF FLUID OTHER THAN OIL INTO AN OIL WELL FROM A ZONE ADJACENT TO THE OIL ZONE WHICH COMPRISES A LAYER OF SUBSTANTIALLY FULLY CURED NEAT PORTLAND CEMENT OCCUPYING AN ARTIFICIALLY PRODUCED FRACTURE EXTENDING INTO SAID OIL ZONE ADJACENT TO THE ZONE CONTAINING SAID OTHER FLUID, AND A SUBSTANTIALLY IMPERMEABLE LAYER ADJACENT EACH SURFACE OF THE PORTLAND CEMENT LAYER CONSISTING OF THE FORMATION ADJACENT SAID FRACTURE HAVING ITS PORES PLUGGED WITH A MATERIAL INSOLUBLE IN OIL AND IN WATER.

References Cited (Backward Citations)

US2368424A Cited
US2492212A Cited
US3053675A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-02-28 1969-08-30 1970-03-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-02-28 1973-08-30 1974-03-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-02-28 1977-08-30 1978-03-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag