← Back to Patent Explorer
US3233453A Expired / Lapsed US ⏱️ 0.0 years remaining

Drill stem testing methods

Assignee: Schlumberger Well Surveying Corp
•
Filing: 1962-06-25
•
Granted: 1966-02-08
•
Expires: 1982-06-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Maurice P Lebourg

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 09:03
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/08; E21B49/087

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 172 words
A METHOD OF TESTING EARTH FORMATIONS TRAVERSED BY A WELL BORE WHEREIN FORMATION FLUIDS ARE INADEQUATE TO PROVIDE A SURFACE FLOW, COMPRISING THE STEPS OF: ISOLATING A FORMATION WITH A PACKING ELEMENT ATTACHED TO A FIRST TUBING STRING WHICH EXTENDS BETWEEN THE EARTH''S SURFACE AND THE ISOLATED FORMATION; INTRODUCING A SECOND TUBING STRING INTO THE FIRST TUBING STRING TO EXTEND BELOW ANY FLUID LEVEL IN THE FIRST TUBING STRING; PROVIDING METERED INPUT GAS UNDER SUFFICIENT PRESSURE TO ONE OF SAID TUBING STRINGS TO DISPLACE A FLUID RECOVERY COMPRISED OF THE INPUT GAS AND FORMATION FLUIDS THROUGH THE OTHER TUBING STRING; MAINTAINING THE FLUID RECOVERY IN A CLOSED SYSTEM TO PREVENT THE ESCAPE OF ANY CONSTITUENTS FROM THE FLUID RECOVERY; TAKING THE FLUID RECOVERY FROM THE CLOSED SYSTEM AT THE EARTH''S SURFACE AND SEPARATING THE GAS AND LIQUID CONSTITUENTS FROM THE FLUID RECOVERY; AND MEASURING THE SEPARATED GAS AT THE EARTH''S SURFACE WHEREBY THE DIFFERENCE BETWEEN THE SEPARATED GAS AND THE INPUT GAS IS DETERMINATIVE OF NET FORMATION GAS IN THE FLUID RECOVERY.
Claim 2
Independent Claim 172 words
A METHOD OF TESTING EARTH FORMATIONS TRAVERSED BY A WELL BORE WHEREIN FORMATION FLUIDS ARE INADEQUATE TO PROVIDE A SURFACE FLOW, COMPRISING THE STEPS OF: ISOLATING A FORMATION WITH A PACKING ELEMENT ATTACHED TO A FIRST TUBING STRING WHICH EXTENDS BETWEEN THE EARTH''S SURFACE AND THE ISOLATED FORMATION; INTRODUCING A SECOND TUBING STRING INTO THE FIRST TUBING STRING TO EXTEND BELOW ANY FLUID LEVEL IN THE FIRST TUBING STRING; PROVIDING METERED INPUT GAS UNDER SUFFICIENT PRESSURE TO ONE OF SAID TUBING STRINGS TO DISPLACE A FLUID RECOVERY COMPRISED OF THE INPUT GAS AND FORMATION FLUIDS THROUGH THE OTHER TUBING STRING; MAINTAINING THE FLUID RECOVERY IN A CLOSED SYSTEM TO PREVENT THE ESCAPE OF ANY CONSTITUENTS FROM THE FLUID RECOVERY; TAKING THE FLUID RECOVERY FROM THE CLOSED SYSTEM AT THE EARTH''S SURFACE AND SEPARATING THE GAS AND LIQUID CONSTITUENTS FROM THE FLUID RECOVERY; AND MEASURING THE SEPARATED GAS AT THE EARTH''S SURFACE WHEREBY THE DIFFERENCE BETWEEN THE SEPARATED GAS AND THE INPUT GAS IS DETERMINATIVE OF NET FORMATION GAS IN THE FLUID RECOVERY.

References Cited (Backward Citations)

US2229884A Cited
US2663545A Cited
US2745282A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-02-07 1969-08-09 1970-02-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-02-07 1973-08-09 1974-02-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-02-07 1977-08-09 1978-02-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag