← Back to Patent Explorer
US3220942A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of controlling electrical properties of the sub-surface metallic structure of oil and gas wells

Assignee: LUCILE WELLS CRITES
•
Filing: 1960-01-19
•
Granted: 1965-11-30
•
Expires: 1980-01-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Virgil C Crites

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 02:07
CPC Classifications
C; C23; C23F; C23F13/00; C23F13/02; C23F13/04

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 318 words
A METHOD OF EFFECTIVELY NEUTRALIZING A FIRST FLOW OF CURRENT BETWEEN FIRST AND SECOND OIL WELLS WHERE THE FIRST CURRENT FLOW RESULTS FROM A POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS AND WHERE THE OIL WELLS HAVE A CONDUCTOR PIPE OF A RELATIVELY SHORT LENGTH, HAVE A SURFACE PIPE DISPOSED WITHIN THE CONDUCTOR PIPE WITH AN INCREASED LENGTH RELATIVE TO THAT OF THE CONDUCTOR PIPE AND HAVE AN OIL STRING DISPOED WITHIN THE SURFACE PIPE WITH AN INCREASED LENGTH RELATIVE TO THAT OF THE SURFACE PIPE AND WHERE THE CONDUCTOR PIPE, THE SURFACE PIPE AND THE OIL STRING OF EACH OIL WELL RESPECTIVELY EXTEND AT PROGRESSIVE DISTANCES INTO THE EARTH AT SPACED POSITIONS FROM THE CONDUCTOR PIPE, THE SURFACE PIPE AND THE OIL STRING OF THE OTHER OIL WELL, THE METHOD CONSISTING OF THE FOLLOWING STEPS WHICH MAY BE MADE WHILE THE FIRST AND SECOND WELLS CONTINUE IN OPERATION: DISPOSING A PLURALITY OF FIRST ELECTRODES INTO THE EARTH AT SPACED POSITIONS AROUND THE FIRST OIL WELL TO DETERMINE THE POTENTIAL DIFFERENCE BETWEEN THE FIRST OIL WELL AND EACH OF THE FIRST ELECTRODES AND TO DETERMINE SUCH POLARITY AND THE DIRECTION OF THE POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS, DISPOSING AT LEAST ONE ADDITIONAL ELECTRODE BETWEEN THE FIRST AND SECOND OIL WELLS AT A POSITION SUBSTANTIALLY ALONG A LINE DEFINING THE DIRECTION OF THE POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS, CONNECTING A VARIABLE RESISTANCE BETWEEN THE FIRST OIL WELL AND THE ADDITIONAL ELECTRODE TO PRODUCE A SECOND FLOW OF CURRENT BETWEEN THE FIRST OIL WELL AND THE ADDITIONAL ELECTRODE IN A DIRECTION OPPOSITE TO THAT OF THE FIRST FLOW OF CURRENT, AND VARYING THE VALUE OF THE VARIABLE RESISTANCE TO PROVIDE THE SECOND FLOW OF CURRENT WITH A MAGNITUDE SUBSTANTIALLY EQUAL TO THAT OF THE FIRST FLOW OF CURRENT TO NEUTRALIZE THE FLOW OF CURRENT BETWEEN THE FIRST AND SECOND WELLS.
Claim 2
Independent Claim 318 words
A METHOD OF EFFECTIVELY NEUTRALIZING A FIRST FLOW OF CURRENT BETWEEN FIRST AND SECOND OIL WELLS WHERE THE FIRST CURRENT FLOW RESULTS FROM A POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS AND WHERE THE OIL WELLS HAVE A CONDUCTOR PIPE OF A RELATIVELY SHORT LENGTH, HAVE A SURFACE PIPE DISPOSED WITHIN THE CONDUCTOR PIPE WITH AN INCREASED LENGTH RELATIVE TO THAT OF THE CONDUCTOR PIPE AND HAVE AN OIL STRING DISPOED WITHIN THE SURFACE PIPE WITH AN INCREASED LENGTH RELATIVE TO THAT OF THE SURFACE PIPE AND WHERE THE CONDUCTOR PIPE, THE SURFACE PIPE AND THE OIL STRING OF EACH OIL WELL RESPECTIVELY EXTEND AT PROGRESSIVE DISTANCES INTO THE EARTH AT SPACED POSITIONS FROM THE CONDUCTOR PIPE, THE SURFACE PIPE AND THE OIL STRING OF THE OTHER OIL WELL, THE METHOD CONSISTING OF THE FOLLOWING STEPS WHICH MAY BE MADE WHILE THE FIRST AND SECOND WELLS CONTINUE IN OPERATION: DISPOSING A PLURALITY OF FIRST ELECTRODES INTO THE EARTH AT SPACED POSITIONS AROUND THE FIRST OIL WELL TO DETERMINE THE POTENTIAL DIFFERENCE BETWEEN THE FIRST OIL WELL AND EACH OF THE FIRST ELECTRODES AND TO DETERMINE SUCH POLARITY AND THE DIRECTION OF THE POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS, DISPOSING AT LEAST ONE ADDITIONAL ELECTRODE BETWEEN THE FIRST AND SECOND OIL WELLS AT A POSITION SUBSTANTIALLY ALONG A LINE DEFINING THE DIRECTION OF THE POTENTIAL DIFFERENCE BETWEEN THE FIRST AND SECOND OIL WELLS, CONNECTING A VARIABLE RESISTANCE BETWEEN THE FIRST OIL WELL AND THE ADDITIONAL ELECTRODE TO PRODUCE A SECOND FLOW OF CURRENT BETWEEN THE FIRST OIL WELL AND THE ADDITIONAL ELECTRODE IN A DIRECTION OPPOSITE TO THAT OF THE FIRST FLOW OF CURRENT, AND VARYING THE VALUE OF THE VARIABLE RESISTANCE TO PROVIDE THE SECOND FLOW OF CURRENT WITH A MAGNITUDE SUBSTANTIALLY EQUAL TO THAT OF THE FIRST FLOW OF CURRENT TO NEUTRALIZE THE FLOW OF CURRENT BETWEEN THE FIRST AND SECOND WELLS.

References Cited (Backward Citations)

US792025A Cited
US2053214A Cited
US2190322A Cited
US2371658A Cited
US2360244A Cited
US2584623A Cited
US2782370A Cited
US2803797A Cited
US2875142A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-11-29 1969-05-31 1969-11-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-11-29 1973-05-31 1973-11-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-11-29 1977-05-31 1977-11-30 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag