← Back to Patent Explorer
US3220503A Expired / Lapsed US ⏱️ 0.0 years remaining

Seismic shooting sequence timer

Assignee: Texaco Inc
•
Filing: 1961-08-29
•
Granted: 1965-11-30
•
Expires: 1981-08-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Tilton R Oakley

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 05:56
CPC Classifications
G; G01; G01V; G01V1/00; G01V1/24; G01V1/26

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 172 words
IN SEISMIC EXPLORATION, A RADIO LINK CONTROLLED SHOOTING SEQUENCE TIMER COMPRISING ELECTRONIC CIRCUIT MEANS FOR RECEIVING AND LIMITING THE AMPLITUDE OF A CONTROL SIGNAL HAVING A PREDETERMINED MONFREQUENCE CHARACTERISTIC AND TIME DURATION, NARROW PASS FILTER MEANS FOR PASSING ONLY SAID PREDETERMINED CONTROL SIGNAL FREQUENCE, GATE MEANS FOR SETTING AN ELECTRONIC TRIGGER UPON PASSAGE OF AT LEAST A PREDETERMINED TIME PORTION OF SAID CONTROL SIGNAL, SAID TRIGGER BEING TRIPPED UPON TERMINATION OF SAID CONTROL SIGNAL, FIRST MONOSTABLE TIMING MEANS CONTROLLED BY SAID TRIGGER WHEN TRIPPED FOR INITATING A FIRST TIME DELAY PERIOD, ADDITIONAL MEANS CONTROLLED BY SAID FIRST TIMING MEANS FOR CLOSING A CIRCUIT TO SWITCH ON A TRANSMITTER PRIOR TO SHOOTING, SECOND MONOSTABLE TIMING MEANS CONTROLLED BY SAID FIRST MONOSTABLE TIMING MEANS AND ACTUATED SIMULTANEOUSLY THEREWITH TO INITIATE A SECOND TIME DELAY PERIOD, SAID SECOND TIME DELAY PERIOD BEING LESS THAN SAID FIRST TIME DELAY PERIOD, MEANS CONTROLLED BY SAID SECOND TIMING MEANS AT THE END OF SAID SECOND TIME DELAY PERIOD FOR ACTUATING A SHOOTING CIRCUIT TO DETONATE A SEISMIC CHARGE.
Claim 2
Dependent Claim 172 words
IN SEISMIC EXPLORATION, A RADIO LINK CONTROLLED SHOOTING SEQUENCE TIMER COMPRISING ELECTRONIC CIRCUIT MEANS FOR RECEIVING AND LIMITING THE AMPLITUDE OF A CONTROL SIGNAL HAVING A PREDETERMINED MONFREQUENCE CHARACTERISTIC AND TIME DURATION, NARROW PASS FILTER MEANS FOR PASSING ONLY SAID PREDETERMINED CONTROL SIGNAL FREQUENCE, GATE MEANS FOR SETTING AN ELECTRONIC TRIGGER UPON PASSAGE OF AT LEAST A PREDETERMINED TIME PORTION OF SAID CONTROL SIGNAL, SAID TRIGGER BEING TRIPPED UPON TERMINATION OF SAID CONTROL SIGNAL, FIRST MONOSTABLE TIMING MEANS CONTROLLED BY SAID TRIGGER WHEN TRIPPED FOR INITATING A FIRST TIME DELAY PERIOD, ADDITIONAL MEANS CONTROLLED BY SAID FIRST TIMING MEANS FOR CLOSING A CIRCUIT TO SWITCH ON A TRANSMITTER PRIOR TO SHOOTING, SECOND MONOSTABLE TIMING MEANS CONTROLLED BY SAID FIRST MONOSTABLE TIMING MEANS AND ACTUATED SIMULTANEOUSLY THEREWITH TO INITIATE A SECOND TIME DELAY PERIOD, SAID SECOND TIME DELAY PERIOD BEING LESS THAN SAID FIRST TIME DELAY PERIOD, MEANS CONTROLLED BY SAID SECOND TIMING MEANS AT THE END OF SAID SECOND TIME DELAY PERIOD FOR ACTUATING A SHOOTING CIRCUIT TO DETONATE A SEISMIC CHARGE.

References Cited (Backward Citations)

US3125026A Cited
US2156624A Cited
US2374779A Cited
US2413296A Cited
US2856852A Cited
US3014215A Cited
US2700753A Cited
US2938168A Cited
US3062315A Cited
US3098212A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-11-29 1969-05-31 1969-11-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-11-29 1973-05-31 1973-11-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-11-29 1977-05-31 1977-11-30 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag