← Back to Patent Explorer
US3216457A Expired / Lapsed US ⏱️ 0.0 years remaining

Laminated tubular article and method of making same

Assignee: Phillips Petroleum Co
•
Filing: 1962-04-18
•
Granted: 1965-11-09
•
Expires: 1982-04-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Fred J Zavasnik

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 01:43
CPC Classifications
B; B29; B29C; B29C53/00; B29C53/56; B29C53/58; B29C53/581; B31; B31C; B31C1/00; B29K; B29K2995/00; B29K2995/0037; B29K2995/005; B29K2995/0053; B29L; B29L2031/00; B29L2031/60; B29L2031/601

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 119 words
A PROCESS FOR PREPARING LAMINATED ARTICLES OF THERMOPLASTIC BIAXIALLY ORIENTED FILM WHICH COMPRISES SIMULTANEOUSLY SEPARATELY WRAPPING ON A PLURALITY OF MANDRELS A PLURALITY OF LAYERS OF SAID FILM UNIT ABOUT ONE HALF OF THE DESIRED LAMINATE THICKNESS IS OBTAINED, POSITIONING SAID MANDRELS TOGETHER SO AS TO HAVE SAME REVOLVE AROUND A COMMON AXIS, CONTINUING THE WRAPPING OF SAID FILM AROUND SAID MANDRELS BY ROTATING THE REPOSITIONED MANDRELS AROUND SAID COMMON AXIS UNTIL THE DESIRED FINAL LAMINATE THICKNESS IS ACHIEVED, HEAT TREATING THE RESULTING LAMINATE FOR A TIME SUFFICIENT TO BRING THE ARTICLE TO A UNIFORM TEMPERATURE AND OBTAIN AN ADHESION BETWEEN THE PLURALITY OF LAYERS OF SAID FILM, COOLING THE THUS TREATED PRODUCT AND REMOVING SAME FROM THE MANDRELS.
Claim 2
Dependent Claim 119 words
A PROCESS FOR PREPARING LAMINATED ARTICLES OF THERMOPLASTIC BIAXIALLY ORIENTED FILM WHICH COMPRISES SIMULTANEOUSLY SEPARATELY WRAPPING ON A PLURALITY OF MANDRELS A PLURALITY OF LAYERS OF SAID FILM UNIT ABOUT ONE HALF OF THE DESIRED LAMINATE THICKNESS IS OBTAINED, POSITIONING SAID MANDRELS TOGETHER SO AS TO HAVE SAME REVOLVE AROUND A COMMON AXIS, CONTINUING THE WRAPPING OF SAID FILM AROUND SAID MANDRELS BY ROTATING THE REPOSITIONED MANDRELS AROUND SAID COMMON AXIS UNTIL THE DESIRED FINAL LAMINATE THICKNESS IS ACHIEVED, HEAT TREATING THE RESULTING LAMINATE FOR A TIME SUFFICIENT TO BRING THE ARTICLE TO A UNIFORM TEMPERATURE AND OBTAIN AN ADHESION BETWEEN THE PLURALITY OF LAYERS OF SAID FILM, COOLING THE THUS TREATED PRODUCT AND REMOVING SAME FROM THE MANDRELS.
Claim 3
Dependent Claim 36 words
A TUBULAR ARTICLE OF MANUFACTURE HAVING A PLURALITY OF CONDUITS THERETHROUGH, SAID TUBULAR ARTICLE BEING COMPOSED OF A PLURALITY OF FUSED LAYERS OF BIAXIALLY ORIENTED FILM TO ADAPTED AS TO PROVIDE A PLURALITY OF CONDUITS THERETHROUGH.
Claim 4
Dependent Claim 36 words
A TUBULAR ARTICLE OF MANUFACTURE HAVING A PLURALITY OF CONDUITS THERETHROUGH, SAID TUBULAR ARTICLE BEING COMPOSED OF A PLURALITY OF FUSED LAYERS OF BIAXIALLY ORIENTED FILM TO ADAPTED AS TO PROVIDE A PLURALITY OF CONDUITS THERETHROUGH.

References Cited (Backward Citations)

US2445290A Cited
US2536587A Cited
US2929744A Cited
US2941911A Cited
US2932323A Cited
US3037529A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-11-08 1969-05-10 1969-11-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-11-08 1973-05-10 1973-11-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-11-08 1977-05-10 1977-11-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag