Abstract 997,538. Wells, &c. FENIX & SCISSON Inc. July 14, 1961 [July 15, 1960], No. 25702/61. Heading E1F. [Also in Division F4] In excavating a subterranean cavern for the storage of liquid petroleum gas (see Division F4) a shaft 38 Fig. 1 is sunk to below the roof level 43 of the proposed cavern, the extension is filled with sand 44 and a steel liner 39 in welded sections is lowered into the shaft, said liner having utility conduits 45, Fig. 2, welded to the exterior thereof thus leaving the interior of the liner free of obstruction thereby facilitating the removal of the sand 44 and of subsequently excavated earth and rock. Each liner section has external handling and locating lugs 53, 54, Fig. 6, welded thereto and the lower end of the first liner section is closed by a cast concrete slab 41 supported by rods 42 which allows water poured into the liner to serve as ballast to assist lowering of the first liner section and of sections subsequently welded thereto. The space between the shaft wall and the liner is filled with cement grouting 40, water is pumped out, slab 41 drilled out, sand 44 removed and the cavern excavated by conventional means. Finally the bottoms of conduits 45 are closed, sections 46, Fig. 4, are cut out of the liner at a predetermined level, conduits 45 cut, grouting 40 removed to provide a space 47 sections 46 replaced and cement is forced down one conduit 45 into space 47 thus effecting a permanent seal and the upper end of the liner is closed by a cap 71, Fig. 7 (not shown).

Inventors

  • 👤 Sidney E Scisson
  • 👤 Gilbert J Fenix

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 01:47
CPC Classifications
B; B65; B65G; B65G5/00; E; E21; E21D; E21D5/00; E21D5/01; F; F17; F17C; F17C3/00; F17C3/005; F17C2203/00; F17C2203/06; F17C2203/0602; F17C2203/0604; F17C2209/00; F17C2270/00; F17C2270/01; F17C2270/0142; F17C2270/0144; F17C2270/0149

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 143 words
IN A METHOD OF SEALING A LINER TO A SURROUNDING HORIZONTAL STRATA AT AN INTERMEDIATE LEVEL IN A VERTICAL ACCESS SHAFT FOR AN UNDERGROUND PRESSURE RESERVIOR, THE STEPS OF JOINING A PLURALITY OF UTILITY CONDUITS TO THE EXTERIOR PERIPHERY OF A LINER IN A LENGTHWISE DIRECTION PRIOR TO INTRODUCING THE LINER INTO THE SHAFT, POSITIONING SAID LINER VERTICALLY IN THE SHAFT, GROUTING THE SPACE BETWEEN THE LINER AND SHAFT, MAINTAINING THE INTERIOR OF SAID CONDUITS CLEAR DURING EMPLACEMENT OF THE LINER IN THE SHAFT, REMOVING A PORTION OF SAID LINER AND SAID CONDUITS AT THE LEVEL WHERE THE SEAL IS TO BE MADE, REMOVING THE GROUTING AND LOOSE EARTH MATERIALS AT SAID LEVEL, CLOSING THE OPENING IN THE LINER, CLOSING SAID CONDUITS BELOW THE LEVEL OF THE SEAL, AND INTRODUCING SEALING MATERIAL TO SAID LEVEL FROM THE SURFACE THROUGH ONE OF SAID CONDUITS.
Claim 2
Dependent Claim 143 words
IN A METHOD OF SEALING A LINER TO A SURROUNDING HORIZONTAL STRATA AT AN INTERMEDIATE LEVEL IN A VERTICAL ACCESS SHAFT FOR AN UNDERGROUND PRESSURE RESERVIOR, THE STEPS OF JOINING A PLURALITY OF UTILITY CONDUITS TO THE EXTERIOR PERIPHERY OF A LINER IN A LENGTHWISE DIRECTION PRIOR TO INTRODUCING THE LINER INTO THE SHAFT, POSITIONING SAID LINER VERTICALLY IN THE SHAFT, GROUTING THE SPACE BETWEEN THE LINER AND SHAFT, MAINTAINING THE INTERIOR OF SAID CONDUITS CLEAR DURING EMPLACEMENT OF THE LINER IN THE SHAFT, REMOVING A PORTION OF SAID LINER AND SAID CONDUITS AT THE LEVEL WHERE THE SEAL IS TO BE MADE, REMOVING THE GROUTING AND LOOSE EARTH MATERIALS AT SAID LEVEL, CLOSING THE OPENING IN THE LINER, CLOSING SAID CONDUITS BELOW THE LEVEL OF THE SEAL, AND INTRODUCING SEALING MATERIAL TO SAID LEVEL FROM THE SURFACE THROUGH ONE OF SAID CONDUITS.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-11-08 1969-05-10 1969-11-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-11-08 1973-05-10 1973-11-09 $3760.00 Window Closed / Lapsed