← Back to Patent Explorer
US3200041A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for reactor leak detection

Assignee: United Kingdom Atomic Energy Authority
•
Filing: 1960-04-29
•
Granted: 1965-08-10
•
Expires: 1980-04-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Ralfe Leonard George
  • 👤 Paget Francis Thomas William

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 09:49
CPC Classifications
G; G21; G21C; G21C17/00; G21C17/02; G21C17/04; G01; G01T; G01T7/00; G01T7/02; G01T7/06; G21C17/041; G21C17/044; G21C17/047; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 143 words
APPARATUS FOR TESTING FOR THE PRESENCE OF A DAMAGED FUEL CARTRIDGE IN A NUCLEAR REACTOR HAVING A PLURALITY OF FUEL CHANNELS FORMING A MATRIX, SAID APPARATUS COMPRISING COOLANT SAMPLING PIPES FOR CONTINUOUSLY TAKING TWO SAMPLES OF COOLANT FROM EACH OF SAID FUEL CHANNELS IN THE REACTOR, SAID PIPES BEING COUPLED WITH A CROSS-MATRIX OF SAMPLING DUCTS CONNECTED TO SAID FUEL CHANNELS FOR IDENTIFYING GAS ISSUING FROM ANY CHANNEL BY ITS CO-ORDINATES IN THE MATRIX, DELAY MEANS CONNECTED TO SAID SAMPLING PIPES, AND MONITORS CONNECTED TO SAID SAMPLING DUCTS VIA SAID DELAY MEANS, SAID DELAY MEANS CAUSING RETARDATION OF FLOW SO THAT THE TIME TAKEN IN PASSAGE FROM THE ENTRY OF SAMPLING COOLANT IN SAID PIPES TO THE MONITORS IS SUCH THAT THE PRINCIPAL ACTIVE SOLID CONSTITUENT IN THE COOLANT IN THE MONITORS EMITTING BETA PARTICLES WITH ENERGIES GREATER THAN 3 MEV. IS RUBIDIUM-88.
Claim 2
Dependent Claim 143 words
APPARATUS FOR TESTING FOR THE PRESENCE OF A DAMAGED FUEL CARTRIDGE IN A NUCLEAR REACTOR HAVING A PLURALITY OF FUEL CHANNELS FORMING A MATRIX, SAID APPARATUS COMPRISING COOLANT SAMPLING PIPES FOR CONTINUOUSLY TAKING TWO SAMPLES OF COOLANT FROM EACH OF SAID FUEL CHANNELS IN THE REACTOR, SAID PIPES BEING COUPLED WITH A CROSS-MATRIX OF SAMPLING DUCTS CONNECTED TO SAID FUEL CHANNELS FOR IDENTIFYING GAS ISSUING FROM ANY CHANNEL BY ITS CO-ORDINATES IN THE MATRIX, DELAY MEANS CONNECTED TO SAID SAMPLING PIPES, AND MONITORS CONNECTED TO SAID SAMPLING DUCTS VIA SAID DELAY MEANS, SAID DELAY MEANS CAUSING RETARDATION OF FLOW SO THAT THE TIME TAKEN IN PASSAGE FROM THE ENTRY OF SAMPLING COOLANT IN SAID PIPES TO THE MONITORS IS SUCH THAT THE PRINCIPAL ACTIVE SOLID CONSTITUENT IN THE COOLANT IN THE MONITORS EMITTING BETA PARTICLES WITH ENERGIES GREATER THAN 3 MEV. IS RUBIDIUM-88.
Claim 3
Independent Claim 119 words
THE METHOD OF TESTING FOR THE PRESENCE OF A LEAKING FUEL CARTRIDGE IN A NUCLEAR REACTOR, SAID METHOD COMPRISING THE STEPS OF TAKING A SAMPLE OF FLUID COOLANT WHICH HAS PASSED OVER SAID FUEL CARTRIDGE, AND THEREBY POSSIBLY BECOME RADIOACTIVE AND CONTAMINATED WITH UNSTABLE GASEOUS FISSION PRODUCTS TRANSMITTING SAID SAMPLE TO A MONITORING POINT WITH A RETARDED FLOW HAVING A TIME DELAY OF A MAGNITUDE SUCH THAT IN SAID SAMPLE AT THE MONITORING POINT THE PRINCIPAL SOLID DAUGHTER PRODUCT DERIVED FROM THE UNSTABLE GASEOUS FISSION PRODUCTS IS RUBIDIUM 88, CAUSING SAID RUBIDIUM TO BE DEPOSITED ON A SURFACE AT SAID MONITORING POINT AND MONITORING SAID SURFACE TO DETECT BETA PARTICLES AND GAMA RAYS OF ENERGIES GREATER THAN 3 MEV.
Claim 4
Independent Claim 119 words
THE METHOD OF TESTING FOR THE PRESENCE OF A LEAKING FUEL CARTRIDGE IN A NUCLEAR REACTOR, SAID METHOD COMPRISING THE STEPS OF TAKING A SAMPLE OF FLUID COOLANT WHICH HAS PASSED OVER SAID FUEL CARTRIDGE, AND THEREBY POSSIBLY BECOME RADIOACTIVE AND CONTAMINATED WITH UNSTABLE GASEOUS FISSION PRODUCTS TRANSMITTING SAID SAMPLE TO A MONITORING POINT WITH A RETARDED FLOW HAVING A TIME DELAY OF A MAGNITUDE SUCH THAT IN SAID SAMPLE AT THE MONITORING POINT THE PRINCIPAL SOLID DAUGHTER PRODUCT DERIVED FROM THE UNSTABLE GASEOUS FISSION PRODUCTS IS RUBIDIUM 88, CAUSING SAID RUBIDIUM TO BE DEPOSITED ON A SURFACE AT SAID MONITORING POINT AND MONITORING SAID SURFACE TO DETECT BETA PARTICLES AND GAMA RAYS OF ENERGIES GREATER THAN 3 MEV.

References Cited (Backward Citations)

US2625657A Cited
US2777812A Cited
US2987459A Cited
US3005100A Cited
US2954473A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-08-09 1969-02-08 1969-08-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-08-09 1973-02-08 1973-08-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-08-09 1977-02-08 1977-08-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag