← Back to Patent Explorer
US3191675A Expired / Lapsed US ⏱️ 0.0 years remaining

Recovery of oil

Assignee: Phillips Petroleum Co
•
Filing: 1961-06-30
•
Granted: 1965-06-29
•
Expires: 1981-06-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Ralph E Gilchrist

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 02:57
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/58

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 167 words
IN A MISCIBLE PHASE DISPLACEMENT PROCESS FOR PRODUCING OIL FROM AN OIL-BEARING RESERVOIR PENETRATED BY AN INJECTION WELL AND A PRODUCTION WELL W HEREIN A QUANTITY OF VISCOSITY REDUCER MISCIBLE WITH THE RESERVOIR OIL IS INJECTED THRU SAID INJECTION WELL INTO SAID RESERVOIR TO ESTABLISH A TRANSITION ZONE BETWEEN THE OIL AND SAID VISCOSITY REDUCER AND DRIVING FLUID IS INJECTED THRU SAID INJECTION WELL BEHIND SAID VISCOSITY REDUCER TO DRIVE SAME, ALONG WITH OIL, THRU SAID RESERVOIR TOWARD SAID PRODUCTION WELL, THE IMPROVEMENT COMPRISING ESTABLISHING SAID TRANSITION ZONE BY INJECTING SAID QUANTITY OF VISCOSITY REDUCER IN SEPARATE PORTIONS ALTERNATELY WITH SEPARATE PORTIONS OF HEAVY OIL COMPATIBLE WITH THE RESERVOIR OIL AND WITH SAID VISCOSITY REDUCER, SAID PORTION OFVISCOSITY REDUCER INCREASING GRADUALLY IN VOLUME FROM A PORTION LESS THAN 0.25 OF THE VOLUME OF THE FIRST PORTION OF OIL AND THE PORTIONS OF OIL GRADUALLY DECREASING IN VOLUME UNTIL THE LAST PORTION OF OIL IS LESS THAN 0.25 OF THE VOLUME OF THE ADJACENT PORTION OF VISCOSITY REDUCER.
Claim 2
Dependent Claim 167 words
IN A MISCIBLE PHASE DISPLACEMENT PROCESS FOR PRODUCING OIL FROM AN OIL-BEARING RESERVOIR PENETRATED BY AN INJECTION WELL AND A PRODUCTION WELL W HEREIN A QUANTITY OF VISCOSITY REDUCER MISCIBLE WITH THE RESERVOIR OIL IS INJECTED THRU SAID INJECTION WELL INTO SAID RESERVOIR TO ESTABLISH A TRANSITION ZONE BETWEEN THE OIL AND SAID VISCOSITY REDUCER AND DRIVING FLUID IS INJECTED THRU SAID INJECTION WELL BEHIND SAID VISCOSITY REDUCER TO DRIVE SAME, ALONG WITH OIL, THRU SAID RESERVOIR TOWARD SAID PRODUCTION WELL, THE IMPROVEMENT COMPRISING ESTABLISHING SAID TRANSITION ZONE BY INJECTING SAID QUANTITY OF VISCOSITY REDUCER IN SEPARATE PORTIONS ALTERNATELY WITH SEPARATE PORTIONS OF HEAVY OIL COMPATIBLE WITH THE RESERVOIR OIL AND WITH SAID VISCOSITY REDUCER, SAID PORTION OFVISCOSITY REDUCER INCREASING GRADUALLY IN VOLUME FROM A PORTION LESS THAN 0.25 OF THE VOLUME OF THE FIRST PORTION OF OIL AND THE PORTIONS OF OIL GRADUALLY DECREASING IN VOLUME UNTIL THE LAST PORTION OF OIL IS LESS THAN 0.25 OF THE VOLUME OF THE ADJACENT PORTION OF VISCOSITY REDUCER.

References Cited (Backward Citations)

US2875831A Cited
US2867277A Cited
US2927637A Cited
US3080917A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-06-28 1968-12-28 1969-06-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-06-28 1972-12-28 1973-06-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-06-28 1976-12-28 1977-06-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag