US3188783A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Discharging powder from highpressure vessels
Assignee: Shell USA Inc
•
Filing: 1962-06-20
•
Granted: 1965-06-15
•
Expires: 1982-06-20
Abstract
No abstract record available.
Inventors
- 👤 William E Savage
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 04:54
CPC Classifications
B; B01; B01J; B01J8/00; B01J8/0015; B01J8/003; B01J3/00; B01J3/02
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
158 words
A HIGH-PRESSURE LETDOWN METHOD OF DISCHARGING PULVERULENT SOLIDS FROM A HIGH-PRESSURE ZONE WHICH CONTAINS SAID SOLIDS AND GAS INTO A LOW-PRESSURE ZONE, SAID METHOD COMPRISING: (A) FLOWING SAID PULVERULENT SOLIDS AND GAS FROM SAID HIGH-PRESSURE ZONE INTO SAID LOW-PRESSURE ZONE THROUGH A SLIT HAVING A LENGTH LONGER THAN SEVERAL TIMES ITS WIDTH, (B) DISCHARGING GAS FROM SAID HIGH-PRESSURE ZONE SEPARATELY FROM SAID FLOW THROUGH THE SLIT, (C) MONITORING THE GAS DISCHARGED IN (B) TO DETECT THE PRESENCE OF SOLIDS THEREIN AND EMITTING AN OVERRIDING SIGNAL WHEN SOLIDS ARE DETECTED THEREIN, AND (D) CONTROLLING THE WIDTH OF SAID SLIT BETWEEN SAID ZONES BY (1) MEASURING A THERMODYNAMIC PROPERTY IN SAID STREAM, SAID PROPERTY BEING RELATED TO A PRESSURE OR TEMPERATURE CHANGE IN SAID STREAM TRANSMITTING A SIGNAL RELATIVE THERETO, (2) ADJUSTING THE WIDTH OF THE SLIT RESPONSIVELY TO SAID SIGNAL, AND (3) INCREASING THE WIDTH OF SAID SLIT INDEPENDENT OF SAID FIRST SIGNAL IN RESPONSE TO SAID OVERRIDING SIGNAL.
Claim 2
Dependent Claim
158 words
A HIGH-PRESSURE LETDOWN METHOD OF DISCHARGING PULVERULENT SOLIDS FROM A HIGH-PRESSURE ZONE WHICH CONTAINS SAID SOLIDS AND GAS INTO A LOW-PRESSURE ZONE, SAID METHOD COMPRISING: (A) FLOWING SAID PULVERULENT SOLIDS AND GAS FROM SAID HIGH-PRESSURE ZONE INTO SAID LOW-PRESSURE ZONE THROUGH A SLIT HAVING A LENGTH LONGER THAN SEVERAL TIMES ITS WIDTH, (B) DISCHARGING GAS FROM SAID HIGH-PRESSURE ZONE SEPARATELY FROM SAID FLOW THROUGH THE SLIT, (C) MONITORING THE GAS DISCHARGED IN (B) TO DETECT THE PRESENCE OF SOLIDS THEREIN AND EMITTING AN OVERRIDING SIGNAL WHEN SOLIDS ARE DETECTED THEREIN, AND (D) CONTROLLING THE WIDTH OF SAID SLIT BETWEEN SAID ZONES BY (1) MEASURING A THERMODYNAMIC PROPERTY IN SAID STREAM, SAID PROPERTY BEING RELATED TO A PRESSURE OR TEMPERATURE CHANGE IN SAID STREAM TRANSMITTING A SIGNAL RELATIVE THERETO, (2) ADJUSTING THE WIDTH OF THE SLIT RESPONSIVELY TO SAID SIGNAL, AND (3) INCREASING THE WIDTH OF SAID SLIT INDEPENDENT OF SAID FIRST SIGNAL IN RESPONSE TO SAID OVERRIDING SIGNAL.
References Cited (Backward Citations)
US2395357A
Cited
US2491445A
Cited
GB762258A
Cited
US2984988A
Cited
US2953440A
Cited
US3055389A
Cited
US3080876A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1968-06-14 | 1968-12-14 | 1969-06-15 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1972-06-14 | 1972-12-14 | 1973-06-15 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1976-06-14 | 1976-12-14 | 1977-06-15 | $7700.00 | Window Closed / Lapsed |