← Back to Patent Explorer
US3184407A Expired / Lapsed US ⏱️ 0.0 years remaining

Boiler composition and method

Assignee: Veolia WTS USA Inc
•
Filing: 1962-02-16
•
Granted: 1965-05-18
•
Expires: 1982-02-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Kahler Harry Lewis
  • 👤 Brown James Kenneth

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 20:05
CPC Classifications
C; C02; C02F; C02F5/00; C02F5/08

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 118 words
A METHOD OF REDUCING CHEMICAL FEED LINE DEPOSITS AND INCREASING BOILER WATER DISPERSIVE POWER OF TANNERY WASTE PRODUCT FED TO BOILERS, WHICH COMPRISES COOKING A SOLUTION OF TANNERY WASTE LIQUOR WITH A WATER SOLUBLE ALKALI, A WATER SOLUBLE PHOSPHATE AND A WATER SOLUBLE SILICATE ALL PRESENT IN SAID SOLUTION IN QUANTITIES SUFFICIENT TO THROW DOWN MAGNESIA AS A PRECIPITATE AND FORM A TANNERY WASTE PRODUCT HAVING A CONTENT OF MGO ON THE WEIGHT OF THE SOLIDS IN THE TANNERY WASTE PRODUCT BELOW 0.2% BY WEIGHT, REMOVING THE PRECIPITATE AND FEEDING THE TANNERY WASTE PRODUCT FREE FROM THE PRECIPITATE ALONG WITH OTHER BOILER CHEMICALS INCLUDING PHOSPHATE IN A CHEMICAL FEED LINE DIRECT INTO THE STEAM DRUM OF A BOILER.
Claim 2
Independent Claim 118 words
A METHOD OF REDUCING CHEMICAL FEED LINE DEPOSITS AND INCREASING BOILER WATER DISPERSIVE POWER OF TANNERY WASTE PRODUCT FED TO BOILERS, WHICH COMPRISES COOKING A SOLUTION OF TANNERY WASTE LIQUOR WITH A WATER SOLUBLE ALKALI, A WATER SOLUBLE PHOSPHATE AND A WATER SOLUBLE SILICATE ALL PRESENT IN SAID SOLUTION IN QUANTITIES SUFFICIENT TO THROW DOWN MAGNESIA AS A PRECIPITATE AND FORM A TANNERY WASTE PRODUCT HAVING A CONTENT OF MGO ON THE WEIGHT OF THE SOLIDS IN THE TANNERY WASTE PRODUCT BELOW 0.2% BY WEIGHT, REMOVING THE PRECIPITATE AND FEEDING THE TANNERY WASTE PRODUCT FREE FROM THE PRECIPITATE ALONG WITH OTHER BOILER CHEMICALS INCLUDING PHOSPHATE IN A CHEMICAL FEED LINE DIRECT INTO THE STEAM DRUM OF A BOILER.

References Cited (Backward Citations)

US1613656A Cited
FR972433A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-05-17 1968-11-16 1969-05-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-05-17 1972-11-16 1973-05-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-05-17 1976-11-16 1977-05-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag