← Back to Patent Explorer
US3170842A Expired / Lapsed US ⏱️ 0.0 years remaining

Subcritical borehole nuclear reactor and process

Assignee: Phillips Petroleum Co
•
Filing: 1961-11-06
•
Granted: 1965-02-23
•
Expires: 1981-11-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Kehler Paul

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 16:16
CPC Classifications
G; G21; G21C; G21C1/00; G21C1/30; E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/2403; G21C7/00; G21C7/34; G21D; G21D9/00; G21C7/30; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 240 words
A NUCLEAR REACTOR COMPRISING IN COMBINATION: A FIRST NUCLEAR FUEL ELEMENT; A FIRST LAYER OF NEUTRON-SLOWING MODERATOR MATERIAL; A SECOND LAYER OF THERMAL NEUTRON BARRIER MATERIAL; AND A SECOND NUCLEAR FUEL ELEMENT; SAID FIRST ELEMENT, FIRST LAYER, SECOND LAYER AND SECOND ELEMENT BEING DISPOSED IN SERIAL ORDER AS NAMED ADJACENT EACH OTHER ALONG AN AXIS; A PRIMARY NEUTRON GENERATOR; AND MEANS TO MOVE SAID GENERATOR PARALLEL TO SAID AXIS FROM A POINT ADJACENT ONE OF SAID FUEL ELEMENTS AND ON ONE SIDE OF SAID LAYERS TO A POINT ADJACENT THE OTHER OF SAID FUEL ELEMENTS AND ON THE OTHER SIDE OF SAID LAYERS; SAID FUEL ELEMENTS EACH BEING OF SUBCRITICAL SIZE AND DISPOSED TO BE ACTIVATED BY NEUTRONS FROM SAID PRIMARY GENERATOR WHEN ADJACENT THERETO INTO A NUCLEAR REACTION PRODUCING SUFFICIENT NUMBERS OF FAST NASCENT NEUTRONS TO IN TURN ACTIVATE AN ADJACENT FUEL ELEMENT INTO A SIMILAR REACTOR BY PASSING SAID NASCENT NEUTRONS THROUGH SAID SECOND AND FIRST LAYERS IN THAT ORDER, BUT INSUFFICIENT NUMBERS TO ACTIVATE AND ADJACENT FUEL ELEMENT THROUGH SAID FIRST AND SECOND LAYERS IN THAT ORDER; SAID SUBSCRITICAL SIZE RESULTING IN DIEING OUT OF SAID REACTION IN ANY OF SAID FUEL ELEMENTS WHEN NOT ACTIVATED BY SUFFICIENT NEUTRONS COMING FROM SAID PRIMARY NEUTRON GENERATOR AND ADJACENT FUEL ELEMENT; AND SAID FIRST AND SECOND LAYER IN THAT ORDER BEING SUFFICIENT TO PREVENT NEUTRONS FROM SAID PRIMARY GENERATOR AND THE FUEL ELEMENT ADJACENT SAID FIRST LAYER FROM PASS-
Claim 2
Dependent Claim 240 words
A NUCLEAR REACTOR COMPRISING IN COMBINATION: A FIRST NUCLEAR FUEL ELEMENT; A FIRST LAYER OF NEUTRON-SLOWING MODERATOR MATERIAL; A SECOND LAYER OF THERMAL NEUTRON BARRIER MATERIAL; AND A SECOND NUCLEAR FUEL ELEMENT; SAID FIRST ELEMENT, FIRST LAYER, SECOND LAYER AND SECOND ELEMENT BEING DISPOSED IN SERIAL ORDER AS NAMED ADJACENT EACH OTHER ALONG AN AXIS; A PRIMARY NEUTRON GENERATOR; AND MEANS TO MOVE SAID GENERATOR PARALLEL TO SAID AXIS FROM A POINT ADJACENT ONE OF SAID FUEL ELEMENTS AND ON ONE SIDE OF SAID LAYERS TO A POINT ADJACENT THE OTHER OF SAID FUEL ELEMENTS AND ON THE OTHER SIDE OF SAID LAYERS; SAID FUEL ELEMENTS EACH BEING OF SUBCRITICAL SIZE AND DISPOSED TO BE ACTIVATED BY NEUTRONS FROM SAID PRIMARY GENERATOR WHEN ADJACENT THERETO INTO A NUCLEAR REACTION PRODUCING SUFFICIENT NUMBERS OF FAST NASCENT NEUTRONS TO IN TURN ACTIVATE AN ADJACENT FUEL ELEMENT INTO A SIMILAR REACTOR BY PASSING SAID NASCENT NEUTRONS THROUGH SAID SECOND AND FIRST LAYERS IN THAT ORDER, BUT INSUFFICIENT NUMBERS TO ACTIVATE AND ADJACENT FUEL ELEMENT THROUGH SAID FIRST AND SECOND LAYERS IN THAT ORDER; SAID SUBSCRITICAL SIZE RESULTING IN DIEING OUT OF SAID REACTION IN ANY OF SAID FUEL ELEMENTS WHEN NOT ACTIVATED BY SUFFICIENT NEUTRONS COMING FROM SAID PRIMARY NEUTRON GENERATOR AND ADJACENT FUEL ELEMENT; AND SAID FIRST AND SECOND LAYER IN THAT ORDER BEING SUFFICIENT TO PREVENT NEUTRONS FROM SAID PRIMARY GENERATOR AND THE FUEL ELEMENT ADJACENT SAID FIRST LAYER FROM PASS-
Claim 3
Dependent Claim 103 words
THE PROCESS OF CONTROLLING THE NUCLEAR REACTOR OF CLAIM 1 TO PRODUCE ENERGY AT A DESIRED PREDETERMINED RATE COMPRISING THE STEPS OF MEASURING THE RATE OF ENERGY GENERATED BY SAID REACTOR AND MOVING SAID PRIMARY NEUTRON GENERATOR PARALLEL TO SAID AXIS TO A POINT WHERE THE REACTOR WILL PRODUCE ENERGY AT SAID DESIRED RATE BY MOVING SAID GENERATOR RELATIVE TO SAID LAYERS IN THE DIRECTION FROM THE SECOND TO THE FIRST FUEL ELEMENT TO REDUCE THE RATE OF ENERGY GENERATION, AND IN THE DIRECTION FROM THE FIRST TO THE SECOND FUEL ELEMENT RELATIVE TO SAID LAYERS TO INCREASE THE RATE OF ENERGY GENERATION.

References Cited (Backward Citations)

US2825689A Cited
US2951946A Cited
US2984745A Cited
US2951943A Cited
US2952019A Cited
US3070697A Cited
US3085957A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-02-23 1968-08-24 1969-02-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-02-23 1972-08-24 1973-02-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-02-23 1976-08-24 1977-02-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag