US3168444A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Servicing apparatus for gas cooled thermal reactors
Assignee: The General Electric Company PLC
•
Filing: 1961-11-27
•
Granted: 1965-02-02
•
Expires: 1981-11-27
Abstract
No abstract record available.
Inventors
- 👤 Ingram David John
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 12:10
CPC Classifications
G; G21; G21C; G21C19/00; G21C19/18; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
195 words
IN A PRESSURIZED GAS-COOLED NUCLEAR REACTOR OF THE KIND INCLUDING A REACTOR CORE HOUSED WITHIN AN ENCLOSING SHELL, SAID SHELL PROVIDING A PLURALITY OF SPACED NORMALLY CLOSED POINTS OF ACCESS TO SAID CORE, AN APPARATUS FOR PERFORMING A MULTIPLICITY OF DISTINCT DIFFERENT SERVICING OERATIONS FOR SAID REACTOR, SAID APPARATUS COMPRISING A TRAVELING AUXILIARY PRESSURE VESSEL CONSTRUCTED TO WITHSTAND THE FULL GAS PRESSURE OF THE REACTOR, AN OPENING IN SAID AUXILIARY PRESSURE VESSEL, GAS-TIGHT SEALING MEANS FOR SAID OPENING, SAID SEALING MEANS BEING CONSTRUCTED TO PROVIDE A GAS-TIGHT SEAL BETWEEN SAID AUXILIARY PRESSURE VESSEL AND ANY SELECTED ONE OF SAID POINTS OF ACCESS, A PLURALITY OF DISTINCT DIFFERENT SEPARATE SELECTIVELY OPERABLE CORE SERVICING MECHANISMS FOR SERVICING A REACTOR CORE IN SAID SHELL, SAID SERVICING MECHANISMS BEING DISPOSED WITHIN SAID AUXILIARY PRESSURE VESSEL, AND POSITIONING MEANS FOR EACH SAID SERVICING MECHANISM, EACH SAID POSITIONING MEANS BEING DISPOSED AT LEAST IN PART WITHIN SAID AUXILIARY VESSEL AND CONSTRUCTED TO BRING ITS SAID MECHANISM SELECTIVELY INTO OPERATIONAL POSITION RELATIVE TO SAID OPENING, WHEREBY TO PLACE ITS SAID MECHANISM IN READINESS TO BE PASSED INTO THE ENCLOSING SHELL THROUGH A SELECTED POINT OF ACCESS AS AND FOR THE PURPOSE AFORESAID.
Claim 2
Dependent Claim
195 words
IN A PRESSURIZED GAS-COOLED NUCLEAR REACTOR OF THE KIND INCLUDING A REACTOR CORE HOUSED WITHIN AN ENCLOSING SHELL, SAID SHELL PROVIDING A PLURALITY OF SPACED NORMALLY CLOSED POINTS OF ACCESS TO SAID CORE, AN APPARATUS FOR PERFORMING A MULTIPLICITY OF DISTINCT DIFFERENT SERVICING OERATIONS FOR SAID REACTOR, SAID APPARATUS COMPRISING A TRAVELING AUXILIARY PRESSURE VESSEL CONSTRUCTED TO WITHSTAND THE FULL GAS PRESSURE OF THE REACTOR, AN OPENING IN SAID AUXILIARY PRESSURE VESSEL, GAS-TIGHT SEALING MEANS FOR SAID OPENING, SAID SEALING MEANS BEING CONSTRUCTED TO PROVIDE A GAS-TIGHT SEAL BETWEEN SAID AUXILIARY PRESSURE VESSEL AND ANY SELECTED ONE OF SAID POINTS OF ACCESS, A PLURALITY OF DISTINCT DIFFERENT SEPARATE SELECTIVELY OPERABLE CORE SERVICING MECHANISMS FOR SERVICING A REACTOR CORE IN SAID SHELL, SAID SERVICING MECHANISMS BEING DISPOSED WITHIN SAID AUXILIARY PRESSURE VESSEL, AND POSITIONING MEANS FOR EACH SAID SERVICING MECHANISM, EACH SAID POSITIONING MEANS BEING DISPOSED AT LEAST IN PART WITHIN SAID AUXILIARY VESSEL AND CONSTRUCTED TO BRING ITS SAID MECHANISM SELECTIVELY INTO OPERATIONAL POSITION RELATIVE TO SAID OPENING, WHEREBY TO PLACE ITS SAID MECHANISM IN READINESS TO BE PASSED INTO THE ENCLOSING SHELL THROUGH A SELECTED POINT OF ACCESS AS AND FOR THE PURPOSE AFORESAID.
References Cited (Backward Citations)
US1804843A
Cited
US2725993A
Cited
US2863815A
Cited
US2936273A
Cited
US2848404A
Cited
US3025226A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1968-02-02 | 1968-08-03 | 1969-02-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1972-02-02 | 1972-08-03 | 1973-02-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1976-02-02 | 1976-08-03 | 1977-02-02 | $7700.00 | Window Closed / Lapsed |