← Back to Patent Explorer
US3158556A Expired / Lapsed US ⏱️ 0.0 years remaining

Fractionation control

Assignee: Phillips Petroleum Co
•
Filing: 1959-09-24
•
Granted: 1964-11-24
•
Expires: 1979-09-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Edward E Hopper

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 13:34
CPC Classifications
B; B01; B01D; B01D3/00; B01D3/42; B01D3/4211; B01D3/425; Y; Y10; Y10S; Y10S203/00; Y10S203/19; Y10S208/00; Y10S208/01

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 139 words
IN A FRACTIONATION SYSTEM WHEREIN A FLUID MIXTURE OF TWO OR MORE COMPONENTS IS DIRECTED TO A FRACTIONATION COLUMN, A VAPOR STREAM IS REMOVED FROM SAID COLUMN, SAID VAPOR STREAM IS COOLED TO CONDENSE AT LEAST A PART OF SAME, AND AT LEAST A PART OF THE RESULTING CONDENSATE IS RETURNED TO THE COLUMN AS EXTERNAL REFLUX, A CONTROL SYSTEM COMPRISING MEANS TO ESTABLISH A FIRST SIGNAL REPRESENTATIVE OF THE FLOW OF EXTERNAL REFLUX TO SAID COLUMN, A THERMOCOUPLE POSITIONED TO ESTABLISH A SECOND SIGNAL REPRESENTATIVE OF THE TEMPERATURE OF SAID EXTERNAL REFLUX, AN ADJUSTABLE VOLTAGE SOURCE FOR ESTABLISHING A THIRD SIGNAL REPRESENTATIVE OF A PREDETERMINED DESIRED FIXED REFERENCE TEMPERATURE WHICH APPROXIMATES THE BUBBLE POINT TEMPERATURE OF THE EXTERNAL REFLUX AT THE PRESSURE WITHIN SAID COLUMN, MEANS RESPONSIVE TO SAID SECOND AND THIRD SIGNALS TO ESTABLISH A FOURTH SIGNAL
Claim 2
Dependent Claim 139 words
IN A FRACTIONATION SYSTEM WHEREIN A FLUID MIXTURE OF TWO OR MORE COMPONENTS IS DIRECTED TO A FRACTIONATION COLUMN, A VAPOR STREAM IS REMOVED FROM SAID COLUMN, SAID VAPOR STREAM IS COOLED TO CONDENSE AT LEAST A PART OF SAME, AND AT LEAST A PART OF THE RESULTING CONDENSATE IS RETURNED TO THE COLUMN AS EXTERNAL REFLUX, A CONTROL SYSTEM COMPRISING MEANS TO ESTABLISH A FIRST SIGNAL REPRESENTATIVE OF THE FLOW OF EXTERNAL REFLUX TO SAID COLUMN, A THERMOCOUPLE POSITIONED TO ESTABLISH A SECOND SIGNAL REPRESENTATIVE OF THE TEMPERATURE OF SAID EXTERNAL REFLUX, AN ADJUSTABLE VOLTAGE SOURCE FOR ESTABLISHING A THIRD SIGNAL REPRESENTATIVE OF A PREDETERMINED DESIRED FIXED REFERENCE TEMPERATURE WHICH APPROXIMATES THE BUBBLE POINT TEMPERATURE OF THE EXTERNAL REFLUX AT THE PRESSURE WITHIN SAID COLUMN, MEANS RESPONSIVE TO SAID SECOND AND THIRD SIGNALS TO ESTABLISH A FOURTH SIGNAL

References Cited (Backward Citations)

US1735470A Cited
US2180512A Cited
US2236035A Cited
US2202218A Cited
US2459404A Cited
US2580651A Cited
US2709678A Cited
US2882693A Cited
US2977289A Cited
US2985565A Cited
US3018229A Cited
US3020213A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-11-24 1968-05-25 1968-11-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-11-24 1972-05-25 1972-11-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-11-24 1976-05-25 1976-11-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag