← Back to Patent Explorer
US3137792A Expired / Lapsed US ⏱️ 0.0 years remaining

High energy neutron detector with evacuated chamber

Assignee: Westinghouse Electric Corp
•
Filing: 1960-04-01
•
Granted: 1964-06-16
•
Expires: 1980-04-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Robert L Staples
  • 👤 Jr Robert R Warnken
  • 👤 Gleason Charles Herbert

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 07:54
CPC Classifications
H; H01; H01J; H01J47/00; H01J47/12; G; G01; G01T; G01T3/00

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 107 words
A NEUTRON SENSITIVE DEVICE COMPRISING A FIRST ELECTRODE, A SECOND ELECTRODE AND A THIRD ELECTRDE, AN EVACUATED REGION BETWEEN SAID FIRST AND SECOND ELECTRODES AND BETWEEN SAID FIRST AND THIRD ELECTRODES, SAID FIRST, SECOND AND THIRD ELECTRODES EACH COMPRISING MATERIAL EMISSIVE OF CHARGED PARTICLES UPON BOMBARDMENT BY GAMMA RADIATION, ONE OF SAID SECOND AND THIRD ELECTRODES HAVING THEREON A LAYER OF MATERIAL EMISSIVE OF CHARGED PARTICLES UPON BOMBARDMENT BY NEUTRON RADIATION, AND CIRCUIT MEANS TO DERIVE AN OUTPUT SIGNAL PROPORTIONAL TO THE DIFFERENCE OF THE CURRENTS BETWEEN SAID FIRST AND SECOND ELECTRODES AND BETWEEN SAID FIRST AND THIRD EOECTRODES TO DETERMINE THE INTENSITY OF INCIDENT NEUTRON RADIATION.
Claim 2
Dependent Claim 107 words
A NEUTRON SENSITIVE DEVICE COMPRISING A FIRST ELECTRODE, A SECOND ELECTRODE AND A THIRD ELECTRDE, AN EVACUATED REGION BETWEEN SAID FIRST AND SECOND ELECTRODES AND BETWEEN SAID FIRST AND THIRD ELECTRODES, SAID FIRST, SECOND AND THIRD ELECTRODES EACH COMPRISING MATERIAL EMISSIVE OF CHARGED PARTICLES UPON BOMBARDMENT BY GAMMA RADIATION, ONE OF SAID SECOND AND THIRD ELECTRODES HAVING THEREON A LAYER OF MATERIAL EMISSIVE OF CHARGED PARTICLES UPON BOMBARDMENT BY NEUTRON RADIATION, AND CIRCUIT MEANS TO DERIVE AN OUTPUT SIGNAL PROPORTIONAL TO THE DIFFERENCE OF THE CURRENTS BETWEEN SAID FIRST AND SECOND ELECTRODES AND BETWEEN SAID FIRST AND THIRD EOECTRODES TO DETERMINE THE INTENSITY OF INCIDENT NEUTRON RADIATION.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-06-16 1967-12-16 1968-06-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-06-16 1971-12-16 1972-06-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-06-16 1975-12-16 1976-06-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag