← Back to Patent Explorer
US3137446A Expired / Lapsed US ⏱️ 0.0 years remaining

Multiple nozzle apparatus

Assignee: Taiheiyo Cement Corp
•
Filing: 1962-07-09
•
Granted: 1964-06-16
•
Expires: 1982-07-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Masuda Senichi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 21:26
CPC Classifications
B; B05; B05B; B05B12/00; B05B12/004; B05B12/006; B05B12/008; B05B7/00; B05B7/02; B05B7/04; B05B7/0416; B05B7/0483

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 181 words
AN APPARATUS FOR SPRAYING MINUTE DIAMETER PARTICLES OF UNIFORM DISTRIBUTION FROM A PLURALITY OF TWO-FLUID NOZZLES COMPRISING: A COMMON GAS PIPING; A COMMON LIQUID PIPING; A FIRST SERIES OF THREE-BRANCHED PIPES, EACH PIPE HAVING ONE BRANCH CONNECTED TO SAID GAS PIPING, ONE BRANCH CONNECTED TO SAID LIQUID PIPING AND ONE BRANCH HAVING A NOZZLE AT ITS END THEREOF, SAID SERIES OF THREEBRANCHED PIPES PROVIDING NOZZLES IN PARALLEL; A SECOND SERIES OF THREE-BRANCHED PIPES CONNECTED TO SAID COMMON GAS PIPING AND SAID COMMON LIQUID PIPING IN THE SAME MANNER AS SAID FIRST SERIES OF THREE-BRANCHED PIPES AND PROVIDED DIRECTLY OPPOSITE SAID COMMON GAS PIPING AND SAID LIQUID PIPING FROM SAID FIRST SERIES OF THREE-BRANCHED PIPES; AND A FLUID RESISTOR IN THE LIQUID BRANCH OF EACH THREE-BRANCHED PIPE, HAVING SUFFICIENTLY GREATER RESISTANCE THAN THE TOTAL REMAINING RESISTANCE OF THE ENTIRE LIQUID FLOW PATH IN ORDER TO EQUALIZE THE LIQUID FLOW RATE INTO EACH SAID NOZZLE; SAID ONE BRANCH HAVING A NOZZLE AT ITS END, FURTHER HAVING AN EXTENSION THEREON UPSTREAM FROM SAID NOZZLE TO THEREBY PROVIDE AN EXIT BRANCH HAVING AN EXTENDED LENGTH.
Claim 2
Independent Claim 181 words
AN APPARATUS FOR SPRAYING MINUTE DIAMETER PARTICLES OF UNIFORM DISTRIBUTION FROM A PLURALITY OF TWO-FLUID NOZZLES COMPRISING: A COMMON GAS PIPING; A COMMON LIQUID PIPING; A FIRST SERIES OF THREE-BRANCHED PIPES, EACH PIPE HAVING ONE BRANCH CONNECTED TO SAID GAS PIPING, ONE BRANCH CONNECTED TO SAID LIQUID PIPING AND ONE BRANCH HAVING A NOZZLE AT ITS END THEREOF, SAID SERIES OF THREEBRANCHED PIPES PROVIDING NOZZLES IN PARALLEL; A SECOND SERIES OF THREE-BRANCHED PIPES CONNECTED TO SAID COMMON GAS PIPING AND SAID COMMON LIQUID PIPING IN THE SAME MANNER AS SAID FIRST SERIES OF THREE-BRANCHED PIPES AND PROVIDED DIRECTLY OPPOSITE SAID COMMON GAS PIPING AND SAID LIQUID PIPING FROM SAID FIRST SERIES OF THREE-BRANCHED PIPES; AND A FLUID RESISTOR IN THE LIQUID BRANCH OF EACH THREE-BRANCHED PIPE, HAVING SUFFICIENTLY GREATER RESISTANCE THAN THE TOTAL REMAINING RESISTANCE OF THE ENTIRE LIQUID FLOW PATH IN ORDER TO EQUALIZE THE LIQUID FLOW RATE INTO EACH SAID NOZZLE; SAID ONE BRANCH HAVING A NOZZLE AT ITS END, FURTHER HAVING AN EXTENSION THEREON UPSTREAM FROM SAID NOZZLE TO THEREBY PROVIDE AN EXIT BRANCH HAVING AN EXTENDED LENGTH.

References Cited (Backward Citations)

US590128A Cited
US1199149A Cited
US1273976A Cited
US2317173A Cited
US2284443A Cited
US2389702A Cited
US2479403A Cited
US2622610A Cited
DE1070872B Cited
US3013703A Cited
US3019993A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-06-16 1967-12-16 1968-06-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-06-16 1971-12-16 1972-06-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-06-16 1975-12-16 1976-06-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag