US3137347A
Expired / Lapsed
US
⏱️ 0.0 years remaining
In situ electrolinking of oil shale
Assignee: Phillips Petroleum Co
•
Filing: 1960-05-09
•
Granted: 1964-06-16
•
Expires: 1980-05-09
Abstract
No abstract record available.
Inventors
- 👤 Harry W Parker
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 14:08
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/2401
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
135 words
A PROCESS FOR PRODUCING HYDROCARBONS FROM OIL SHALE IN SITU WHICH COMPRISES PROVIDING AN ELECTRICAL CONDUCTOR CABLE, FULLY INSULATED EXCEPT A LOWER END SECTION THEREOF AND EXTENDING FROM GROUND SURFACE INTO A LOWER LEVEL OF SAID SHALE WITHIN A BOREHOLE; PACKING SAID BOREHOLE AROUND SAID CABLE SOLELY WITHIN SAID SHALE WITH A PARTICULATE ELECTRICAL CONDUCTIVE MATERIAL IN CLOSE CONTACT WITH SAID SHALE AND IN CONTACT WITH THE LOWER UNINSULATED END OF SAID CABLE AS A FIRST ELECTRODE; PROVIDING A CASING EXTENDING INTO THE UPPER SECTION OF SAID CONDUCTIVE MATERIAL AS A SECOND ELECTRODE IN SAID SHALE; PASSING ELECTRIC CURRENT BETWEEN SAID ELECTRODES THRU SAID CONDUCTIVE MATERIAL SO AS TO HEAT ADJACENT SHALE AND RENDER SAME CONDUCTIVE AND DISTILL HYDROCARBONS THEREFROM; AND RECOVERING PRODUCED HYDROCARBONS FROM A BOREHOLE IN SAID SHALE COMMUNICATING WITH THE HEATED AREA.
Claim 2
Dependent Claim
135 words
A PROCESS FOR PRODUCING HYDROCARBONS FROM OIL SHALE IN SITU WHICH COMPRISES PROVIDING AN ELECTRICAL CONDUCTOR CABLE, FULLY INSULATED EXCEPT A LOWER END SECTION THEREOF AND EXTENDING FROM GROUND SURFACE INTO A LOWER LEVEL OF SAID SHALE WITHIN A BOREHOLE; PACKING SAID BOREHOLE AROUND SAID CABLE SOLELY WITHIN SAID SHALE WITH A PARTICULATE ELECTRICAL CONDUCTIVE MATERIAL IN CLOSE CONTACT WITH SAID SHALE AND IN CONTACT WITH THE LOWER UNINSULATED END OF SAID CABLE AS A FIRST ELECTRODE; PROVIDING A CASING EXTENDING INTO THE UPPER SECTION OF SAID CONDUCTIVE MATERIAL AS A SECOND ELECTRODE IN SAID SHALE; PASSING ELECTRIC CURRENT BETWEEN SAID ELECTRODES THRU SAID CONDUCTIVE MATERIAL SO AS TO HEAT ADJACENT SHALE AND RENDER SAME CONDUCTIVE AND DISTILL HYDROCARBONS THEREFROM; AND RECOVERING PRODUCED HYDROCARBONS FROM A BOREHOLE IN SAID SHALE COMMUNICATING WITH THE HEATED AREA.
References Cited (Backward Citations)
US1372743A
Cited
US2634961A
Cited
US2795279A
Cited
US2799641A
Cited
US2818118A
Cited
US2801090A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1967-06-16 | 1967-12-16 | 1968-06-16 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1971-06-16 | 1971-12-16 | 1972-06-16 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1975-06-16 | 1975-12-16 | 1976-06-16 | $7700.00 | Window Closed / Lapsed |